My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-26_GENERAL DOCUMENTS - C1981018
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981018
>
2017-01-26_GENERAL DOCUMENTS - C1981018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 10:29:10 AM
Creation date
1/26/2017 10:27:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981018
IBM Index Class Name
General Documents
Doc Date
1/26/2017
Doc Name
Midterm Review & Findings & Cost Estimate (MT7)
From
DRMS
To
Blue Moutain Energy, Inc
Permit Index Doc Type
Findings
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
115 <br />Site Maintenance During Reclamation and Ten- <br />SITEMAINT <br />1 <br />400.00 <br />$130,274.00 <br />Total = <br />Year Liability <br />ENANCE <br />2,404.05 <br />Total= <br />$179,053.27 <br />120 <br />1 <br />$38,901.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />10.00 <br />TOTAL O & P = <br />Reclamation <br />CONTRACT AMOUNT (direct + O & P) _ <br />$5,252,594.63 <br />121 <br />1 <br />$6,302.00 <br />Mobilize/Demobilize Equipment for Initial <br />MOBILIZE <br />10.00 <br />Reclamation <br />122 <br />1 <br />$4,698.00 <br />Mobilize/Demobilize Equipment for Pond <br />MOBILIZE <br />10.00 <br />Cleaning/Maintenance <br />SUBTOTALS: <br />4808.09 <br />$4,487,080 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: <br />2.02 <br />Total = <br />$90,639.02 <br />Performance bond: <br />1.05 <br />Total = <br />$47,114.34 <br />Job superintendent: <br />2,404.05 <br />Total= <br />$179,053.27 <br />Profit: <br />10.00 <br />Total = <br />$448,708.00 <br />TOTAL O & P = <br />$765,514.63 <br />CONTRACT AMOUNT (direct + O & P) _ <br />$5,252,594.63 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): <br />Engineering work and/or contract/bid preparation: <br />Reclamation management and/or administration: <br />0.00 <br />4.61 <br />3.58 <br />CONTINGENCY: 0.00 <br />Total = <br />Total = <br />0.00 <br />$242,144.61 <br />$188,042.89 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $1,195,702.13 <br />TOTAL BOND AMOUNT (direct + indirect) _ $5,682,782.13 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.