My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-25_INSPECTION - C1996083
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1996083
>
2017-01-25_INSPECTION - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2017 6:44:11 AM
Creation date
1/26/2017 6:35:59 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Inspection
Doc Date
1/25/2017
Doc Name
Inspection Report
From
DRMS
To
Bowie Resources, LLC
Inspection Date
1/17/2017
Email Name
CCW
JRS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
January 17, 2017 C-1996-083/Bowie No. 2 Mine CCW <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 6 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 3 of 4 <br /> <br />The out slopes of the pile were partially snow covered and the pile was stable. Gob Piles #2 and #4 have been <br />keyed together. The access road on pile #2 is generally in good condition. There was one portion of the cut slope <br />in the gob material that has shifted. This was likely due to the recent precipitation followed by snowfall. This <br />section will be repaired when conditions allow. The top of pile #2 had water ponded on the top of it, please see <br />the Hydrologic Balance section for more details. Pile #4 was stable and no issues were noted. <br /> <br />ROADS – Rule 4.03 <br />Construction 4.03.1(3)/4.03.2(3) <br />Drainage 4.03.1(4)/4.03.2(4) <br />Surfacing and Maintenance4.03.1(5) and (6)/4.03.2(5) and (6) <br />Reclamation 4.03.1(7)/4.03.2(7): <br /> The Haul Road at the Bowie No. 2 Mine is a paved road that reaches from the D Portal Bench and the <br />Mine Office to the Preparation Plant and Coal Stockpile areas. The road was plowed and in good condition. The <br />ditches were partially snow covered and functioning as designed. The access roads above the Utility Bench were <br />inaccessible due to snow. The haul road from the Preparation Plant to the #2 and #4 gob piles was in good <br />condition. The ditches were functioning as designed. <br /> <br /> <br />DOCUMENTS RECEIVED: None <br />OTHER (SPECIFY) <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.