My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-02_PERMIT FILE - C1984065A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1984065
>
2016-12-02_PERMIT FILE - C1984065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:28:10 AM
Creation date
1/24/2017 9:49:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065A
IBM Index Class Name
Permit File
Doc Date
12/2/2016
Doc Name
and Exhibits
Section_Exhibit Name
2.0 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FUGITIVE PARTICULATE EMISSION CONTROL PLAN <br />STORM KING MINES, INC. <br />Permit 84GA323F -1 <br />The following fugitive particulate emission control measures shall be used <br />for enforcement purposes on the sources covered by this permit, as required <br />by the Air Quality Control Commission Regulation No. 1. <br />1. Stockpiles of topsoil, rock, overburden, shall be watered as needed to <br />prevent visible fugitive particulate emissions and to promote growth <br />of vegetation. <br />2. A chemical stabilizer will be applied to the coal stockpile when <br />undisturbed for three or more days to minimize fugitive emissions. <br />3. Refuse impoundment dams will be compacted by sheeps foot compactor. <br />Refuse stored in pond shall be covered by water until area is reclaimed. <br />4. Permanent stockpiles will be protected from wind erosion by construction <br />of 8 feet tall berms and planting of 20 foot tall trees around the piles. <br />5. Conveyor /stackers shall be used to deposit material on rock and coal <br />stockpiles. <br />6. Unpaved haul roads on site shall be watered within 10 hours each day. <br />Chemical dust suppressants will supplement watering as needed. Vehicle <br />speeds shall be limited to 30 m.p.h. on site and controlled by <br />managerial personnel. <br />7. Permanent haul roads shall be gravelled initially and paved after achieving <br />full mining operation starting mid -1987. <br />8. Haul vehicles shall have loads wetted and be washed on the outside prior <br />to transporting of loads offsite. Load size shall be limited to 90% of <br />capacity of each vehicle. <br />9. Mud and dirt carryout onto paved surfaces shall be prevented by maintaining <br />gravelled entryways, washing down vehicles prior to entry onto paved roads <br />and limiting load size. Any carryout shall be removed at least once <br />every eight hour period, five days per week. <br />• <br />
The URL can be used to link to this page
Your browser does not support the video tag.