My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-12-02_PERMIT FILE - C1984065A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1984065
>
2016-12-02_PERMIT FILE - C1984065A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/29/2019 10:28:10 AM
Creation date
1/24/2017 9:49:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065A
IBM Index Class Name
Permit File
Doc Date
12/2/2016
Doc Name
and Exhibits
Section_Exhibit Name
2.0 Legal, Financial, Compliance and Related Information
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
106
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL TERMS AND CONDITIONS: (IMPORTANT! READ ITEMS 6, 7, and 8) <br />1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applicant <br />and is conditioned upon conduction of the activity, or construction, installation and operation of the source, in <br />accordance with this information and with representations made by the applicant or applicant's agents. It is valid <br />only for the equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been deter- <br />mined by the APCD to be necessary to assure compliance with the provisions of C.R.S. 1973, 25- 7- 114(4)(g) <br />and, as such, shall be enforceable under the provisions of C.R.S. 1973, 25 -7 -115 after final approval of the permit <br />has been granted. Emission limits are imposed to ensure that emissions will not (1) interfere with reasonable <br />further progress toward attainment of the NAAQS for pollutants as required by C.R.S. 1973, Sections 25.7- 114(4)(g)(1)(B) <br />and 25- 7- 301(i); Section 172(b)(3) of the Federal Clean Air Act, 42 USC 7502 (b)(3); and Section IV.D.2. of the <br />Air Quality Control Commission Regulation No. 3 or (2) result in an exceedance of the NAAQS for pollutants <br />as required by C.R.S. 1973, Sections 25 -7 -102, 25- 7- 105(1)(a)(1), and 25- 7- 201(1)(b); Section 165(a)(3) of the Clean <br />Air Act, 42 USC 7475(a)(3); and Section IV.D.1.c. of Air Quality Control Commission Regulation No. 3. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to, or appeal <br />of, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence this permit shall <br />be deemed denied ab initio. This permit may be revoked at any time prior to final approval by the Air Pollution <br />Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air <br />Quality Control Commission (AOCC), including failure to meet any express term or condition of the permit. <br />4. This permit and any required attachments must be retained and made available for inspection upon request at <br />the location set forth herein. With respect to a portable source which is moved to a new location, a copy of the <br />revised Air Pollutant Emissions Notice (APEN) (required by law to be submitted to the APCD whenever a portable <br />source is relocated) should be attached to this permit. The permit may be reissued to a new owner by the APCD <br />• as provided in Section 111.8. of AOCC Regulation No. 3 upon a request for transfer of ownership. <br />5. Issuance (initial approval) of an emission permit does not provide "final" authority for this activity or operation <br />of this source. Final approval of the permit must be secured from the APCD in writing in accordance with the <br />provisions of C.R.S. 1973, Section 25- 7- 114(4)(j) and Section IV.H. of AQCC Regulation No. 3. Final approval <br />cannot be granted until the operation or activity commences and has been verified by the APCD as conforming <br />in all respects with the conditions of the permit. If the APCD so determines, it will provide written documentation <br />of such final approval, which does constitute "final" authority to operate. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 18 months <br />after either the date of issuance of this permit or the date on which such construction or activity was scheduled <br />to commence as set forth in the permit, whichever is later, (2) discontinue construction for a period of 18 months <br />or more, or (3) do not complete construction within a reasonable time of the estimated completion date. Exten- <br />sions of the expiration date may be granted by the APCD upon a showing of good cause by the permittee. <br />7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of <br />the permitted operation or activity. Failure to do so is a violation of C.R.S. 1973, Section 25- 7- 114(4)(j) and Regula- <br />tion No. 3., Section IV.H.1., and can result in the revocation of the permit. <br />S. YOU MUST obtain final approval within six months of the commencement of operation as that term is defined <br />by the AQCC. Failure to obtain final approval will result in the revocation of the permit. <br />• <br />9. Violation of the terms of a permit which has received final approval or of the provisions of the Colorado Air Quality <br />Control Act or the regulations of the AOCC may result in administrative, civil or criminal enforcement actions <br />under C.R.S. 1973, Sections 25 -7 -115 (enforcement), 25 -7 -121 (injunctions), 25 -7 -122 (civil penalties) and 25 -1 -114 <br />(criminal penalties). <br />APCD 83 (REV. 10183) <br />
The URL can be used to link to this page
Your browser does not support the video tag.