Laserfiche WebLink
Chevron North Clear Creek Construction Material Mine <br /> Permit No. M-2006-039 <br /> Date Company Operator Tons Material Comments <br /> Initials Destination <br /> 7/17/2016 Foundations DL 13.5 25-av <br /> 7/20/2016 Foundations DL 6.75 25-bv <br /> 7/23/2016 Foundations DL 13.5 22-1 <br /> 7/27/2016 Foundations DL 13.5 28-1 <br /> 7/28/2016 Foundations DL 13.5 28-2 <br /> Month Jul-16 1-Scrapper=24.3 tons <br /> Total tons 1- loader bucket=6.75 Tons <br /> 1-end dump=20.25 Tons <br /> 1.35cy per ton. 1-belly dump=28.35 tons <br /> 1-excavator bucket= 5.4 Tons <br />