Laserfiche WebLink
Chevron North Clear Creek Construction Material Mine <br /> Permit No. M-2006-039 <br /> Date Company Operator Tons Material Comments <br /> Initials Destination <br /> 6/25/2016 Foundations DL 13.5 26-av <br /> Month Jun716 1-Scrapper=24.3 tons <br /> Total tons 1 . $ 1- loader bucket=6.75 Tons <br /> 1-end dump= 10 Tons <br /> 1.35cy per ton. 1-belly dump= 21 tons <br /> 1-excavator bucket= 5.4 Tons <br />