My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-11_REVISION - M1982121
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1982121
>
2017-01-11_REVISION - M1982121
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/16/2021 2:26:01 PM
Creation date
1/13/2017 2:18:02 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1982121
IBM Index Class Name
Revision
Doc Date
1/11/2017
Doc Name
Complete Appliation
From
RMR Aggregates, Inc.
To
DRMS
Type & Sequence
SO3
Email Name
ACY
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 1 <br />Typical Design Characteristics <br />Line Length Traver Trail Intersection to Scale House: 5330 feet <br />Scale House to Rock Dust Mill: 1980 feet <br />Scale House to GAP Service Entrance: 2740 feetl <br />Type of structure Buried Cable-In-Condult (CIC): <br />Schedule 40 — 2" <br />Single Conductor 4/0 Aluminum 1SkV <br />220 mil EPR <br />Burial Depth <br />Minimum 35" <br />Pulling Vault Spacing <br />500 feet to 750 feet <br />Right of Way width <br />Consistent with Transfer Trail ROW <br />Land disturbed (approx.) <br />Temporary <br />Pre -Ripping of the Road Surface <br />Prior to plowing of the CIC approximate centerline <br />of the road will be ripped 3' wide for the entire <br />length of the ROW. (0.7 acres) All disturbed areas <br />will be within the existing road disturbance. <br />Vault Installation <br />Road bed will be excavated to Install pulling vaults. <br />Vaults will be burled below road grade. (1300 sgft) <br />Permanent <br />None. All disturbed areas will remain within the <br />road ROW. Road maintenance will occur <br />Immediately after Installation to return road to full <br />service. <br />Access Roads <br />Use existing Transfer Trail <br />Voltage <br />15.000 volts <br />Circuit configuration <br />Three-phase <br />Conductor size <br />4/0 <br />Page 8 of8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.