Laserfiche WebLink
Table 3 <br /> Qgeralkrns under Case No.05CW107-A and Rule 14 Plan <br /> City of Lamaes Monthly Accounting for April 2016 through March 2017 <br /> Inclusive of Pumping under Rule 14,W-4015,and Case No.05CW107-A <br /> values In sc-11 <br /> Pro/ecled <br /> Row r-16 May-18 Jun-16 Jul-16 Aug-18 Sep-16 Oct-16 Nov-16 Dec-18 Jan-17 Feb-17 Mar-17 Total <br /> 52 Net return flow obligallons for Well 31 Backup;Park.Cemetery,and Shop wells;and Wells 1-20 6 10A after assignment of Project water Sum of Rows 8 9 17 49 3 51,Positive means net accretion of <br /> return flows alter assignment of Project water. <br /> 53 Amount of excess curnutallve delivery at augmentation station that Is manuatfy,assigned below the Lamar Canal for well depletions <br /> 54 Net depletions(-)or accretions(+)tinder the Rule 14 and 05CW107-A Plans.Sum of Rows 7.15.19,25.31,51 &52-NOTE Row 33(Idler return flow obligation)Is sho added to this row In the wittier, <br /> as no augrnenlalion deliveries are made at the Ft.Bent Augmentation Station(no diversions).NOTE 2:Row 51 must be added because Row 52 Indudes both the depletion and replacement of Webs 1- <br /> 20 h t0A Rule 14 pumping.Adding Row 51 avoids doub(e•counfing these depletions. <br /> 55 Total evaporation depletions from North Gateway Park Ponds 1 g 2. <br /> 56 Amount of evaporation covered by LAWMA sources(Including CPW agreement)under Case No.02CW181. <br /> 57 Amount of evaporation covered by additional sources or SWSP pursuant to the final decree in Case No.13CW3080. <br /> 58 Projed return flows assigned for augmen allon of North Gateway Park Pond Nos.1 d 2.Minimum of a)Row Raw 48-Row 49-Row 51,or b)-Row 55-Row 56-Row 57 <br /> 59 Amount of excess cumulative delivery at augmentation station Dot is manually assigned below the Lamar Canal for North Gateway Park Ponds evaporation. <br /> 60 Net augmentation requirement for Lamar North Gateway Park Pond Nos.1 3 2,to come from excess acCneltons and return flows.Mlnlmlm of net re"rement Inducing any shortfall from previous month <br /> (sum of Rows 55-59 and previous mordh's Row 61),or remaining excess accretions and return flows(Row 54). <br /> 51 Sum of Rows 55-60. <br /> 62 Net effect of all of Lamars operatlons.Equal to Row 64+Row 61-Row60.Negative(-)values indicate nel depletion to river/Positive values rndicale net accretion to mar.NOTE.This formula does not <br /> con3kier additional excess augmentation deliveries over whal is assigned specifically for credit in Rows 53 a 59. <br /> Heron A VVJAwm4m P C 2010 La wr Amuw"vl 13-05CW l W-A 5RS'2016.12:19 PM <br />