My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-09_HYDROLOGY - M1977572
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1977572
>
2017-01-09_HYDROLOGY - M1977572
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2020 6:23:40 AM
Creation date
1/10/2017 9:17:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977572
IBM Index Class Name
Hydrology
Doc Date
1/9/2017
Doc Name Note
Comments 6/1/2016-3/31/2017
Doc Name
Comments 6/1/2016-3/31/2017
From
DNR Water Resources
To
DRMS
Email Name
AME
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 3 <br /> Operates under Case No.05CW107-A and Rule 14 Plan <br /> City of l.ornar's Monthly Accounting for April 2016 through March 2017 <br /> Inclusive of Pumping under Rule 14,W4015,and Case No.OSCW107-A <br /> (values in ac-tt) <br /> PMted <br /> Row -16 May-18 Jun-16- Juk16. Aua-16 setr18 Oct-16 Nov-113 Dec-18 Jan-17 Feb-17 Mwr_t� 7newi <br /> 18 Table 1 Raw 6a x 15%. -' -" -- <br /> 19 Row 18 returned to Willow Creek.13%of balffiwid pumping of FL Bell water(Table 1 Row Ba)lagged.2%returned in same month as applicallum Willow Creek Aquder and Glover parameters. <br /> 20 Metered sewage ineuerd to wastewater Imalmenl lagoons. <br /> 21 Metered use of Well ID No.6705272 for non•consumplive coal wasting of Lamar Power Plant and discharge to sewer. <br /> 22 Minimum of 1)Row 20-Row 21.2)95%of net total inbuiidkg use not including non.sewered use(95%x(fable 1 Row 19-Table 3 Row 12))_ <br /> 23 Evaporation and evapotranspiration from lagoons.(63.7 acres water surface and 37-4 acres phrealophytes). <br /> 24 (Row 22+Row 23)x(Row 11-Row 12)!(f able 1.Row 19-Row 12). <br /> 25 Row24 returned to Arkansas River.SDF=13.8. <br /> 26 Delivery of Fort Bent shares under Case No.02CW181.Equal to the sun of Table i.Row 4b+Table 1,Row 9. <br /> 27 Hlslodral return flow obligation an deliveries in Row 26 pursuant to Case No.02CW181. <br /> April-October.Row 26 x 33.8%. <br /> November-March:Row28 x 100%(the decree In Case No.02CW 181 limits diversions to April-October only), <br /> 28 Row 27+Table 1.Row 4b+Row 28 from previous month. <br /> 29 Delivery of Fort Bent shares pursuant to Case No.05CW107-A.Equal to The sum of Table 1.Rows Sb,So.and 10. <br /> 30 Return now factors fa 10 Bean shares pursuant to the decree in Case No.05CW 107-A. <br /> 31 Return flow obligation for delivery of 10 Bean shares.AprU-October.Equal to-Row,30 x Row 29 x 101 total number of O5CW707-A shares delivered.November-Mardi Equal to-Row 30 x Total of Row 29 <br /> x 101 Iotal number of 05CW 107-A shares delivered. (See"Co lror'sheet for total number of 05CW 107-A shares delivered.) <br /> 32 Return flow factors for Idler shares pursuant to the decree In Case No.OSCWI07-A. <br /> 33 Return now obligation for delivery of Idler shares.Ap►n•October Equal to-Row 32 x Row 29 x number of Idler shares delivered i total number of OSM107-A shares delivered.November-March:Equal to- <br /> Row 32 x Total of Row 29 x number of Idler shares delivered i total number or 05CW107-A shares delivered. (See"Control'sheet for total number of 05CW 107-A shares delivered.Idler shares delvered <br /> =total 05CW 107-A shares mires 10 Bean shares.)In Summer this is delivered above the Lamar Canal headgale.In Wirier it is delivered at or above the confluence of Clay Creek(see Row 48). <br /> 34 Row 33-Row 36+Table 1,Row Sb+Row 34 from previous month. <br /> 35 Row 28+Row 34-Sum of April-to-Prewous Moth's Row 36.Total cumulative balance at the ougmmlation station for Case Nos.02CW1a I&05CW107-A deliveries,alter assignment of excess <br /> deliveries to augmen(City depletions in Row 36. <br /> Rows 35&37,April 2015:Cumulativs balance was 48.3 ac-fL 36.9 ac-ft of this is assigned to unmet idler return flew obligations(05CW17-07-A)over the winter of 2015-201 L See March 2016 <br /> accounting sheet <br /> 36 Amount of excess cumulative delivery at augmentation station from Row35 that is manually assigned to well and evaporation depletions belowthe Lamar Canal.Sum of Rows 53&59. <br /> The Lamar Canal passed the assigned augmentation station deliveries in 2015.indicated by the stream flows measured at the Lamar gage during those months. <br /> 37 Row 35-Row 36.Should remain positive. <br /> 38 Minimum at 1)Table 2 Row 8 or 2)Table 1 Row 19-Table 3 Row 11.Constrained to powtive numbers or zero. <br /> 39 (Row 22+Row 23)x(Row 38)/(Table 1,Row 19). <br /> 40 Minimum of 1)Table 2 Row 8-Table 3 Raw 38 or 2)Table 1 Row 18-Table 1 Row 19-Table 3 Row 13.Constrained to positive numbers or zero. <br /> 41 Row40 x 1S%. <br /> 42 Table 1 Row 6b x 15%. <br /> 43 13%of Irrigation with Project water Is lagged as deep percolation(SOF-429 for Town use,and Willow Creek Aquifer and Glover Paramelem for Ballneld use).and 2%returns in the same month of <br /> application.(Row 40+Table 1 Row 6b)it 2%+Row 40 x 13%,togged+Table 1 Row 6b x 13%,fagged. <br /> 44 Row 39+Row 43. <br /> 45 90%of transit loss of Project water between John Martin Reservoir and the Ft.Bent Ditch. Trarnst loss is calculated as the difference between deliveries of Project wafer below John Martin Reservoir and <br /> diversion of Project water by the FL Beni Ditch.(90%of Col.2-Col.4 of'Monthly FlBertl'sheel.) <br /> 46 90%of actual Fart Berl conveyance fosses of Project water,lagged to Arkansas River and combined with lagged amounts from previous years.Lagging based on factors from HI model. Conveyance <br /> loss calculated as the difference between Ft.Berl diversions of Project water mid deliveries of Project water to Lamar's recharge site and the Banfields.60%of these net lagged ditch losses accrues in <br /> the Arkansas River above the Lamar Canal headgate,and 40%accrues below the Lamar Canal headgate. <br /> 47 Row 45+Row 46. <br /> 48 Row 44+Row 47. <br /> 49 Project return flow and naFcomumed loss assigned to depletion by Well 31 backup and depletions by the Pads.Cemetery,and Shop wells Dial are not covered by LAWMA. Calculated as the minimum <br /> of a)Row 44+Row 47.or b)the negative sum of Rows 8&9. <br /> 60 Lagged depletions caused by pumping by Wets 1-20 and!ILA under the Rule 14 Plan(Row 1).SDF-5825. <br /> 51 Project velum Clow and non-consumed loss assigned to deplelltms by Wells 1.20 and 10A pumping udder the Rule 14 Plan(Row 50). Calculated as the mi*r ml of a)Ru w48-Row 49,or b)the <br /> negative of Row 50. <br /> Bevan&W MMM".P C 2016 Lemur Aamufeq v1 T34ZCWte7•A 5r25/2016.12 ra PM <br />
The URL can be used to link to this page
Your browser does not support the video tag.