Laserfiche WebLink
BULLDOZER WORK <br />Task description: Regrade Pond 014 <br />Site: New Horizon Mine Permit Action: SL18 Permit/Job#: C1981008 <br />PROJECT IDENTIFICATION <br />Task #: 056 State: Colorado Abbreviation: None <br />Date: 12/28/2016 County: Montrose Filename: C008-056 <br />User: JDM <br />Agency or organization name: Colorado Division of Reclamation, Mining and Safety <br />HOURLY EQUIPMENT COST <br />Basic Machine: <br />Cat D9T - 9SU <br />Horsepower: <br />405 <br />Blade Type: <br />Semi -Universal <br />Attachment: <br />NA <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Ownership Cost/flour: <br />Operating Cost/Hour: <br />Ripper own. <br />Cost/Hour: <br />Ripper op. Cost/Hour: <br />Operator Cost/Hour: <br />Total unit Cost/Hour: <br />Total Fleet Cost/Hour: <br />$97.48 <br />Utilization % <br />NA <br />$103.60 <br />100 <br />$0.00 <br />NA <br />$0.00 <br />0 <br />$38.89 <br />NA <br />$239.97 <br />$239.97 <br />MATERIAL QUANTITIES <br />Initial Volume: 3,269 <br />Swell factor: 1.165 <br />Loose volume: 3,808 LCY <br />Source of estimated volume: Operator Task 13 <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />100 feet <br />1,243.2 LCY/hr <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push <br />gradient: <br />Average site altitude: <br />0% <br />5.700 feet <br />Material weight: 2,900 lbs/LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />CIRCES Cost Estimating Software <br />