Laserfiche WebLink
Task description: <br />Site: New Horizon Mine <br />PROJECT IDENTIFICATION <br />COST SUMMARY WORK <br />of SL -18 Tasks <br />Permit Action: SL18 <br />Task #: 000 State: Colorado <br />Date: 12/28/2016 County: Montrose <br />User: JDM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Permit/Job#: C1981008 <br />Abbreviation: None <br />Filename: C008-000 <br />Task <br />Form <br />Description Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />056 <br />081 <br />082 <br />083 <br />084 <br />085 <br />096 <br />81B <br />82B <br />Regrade Pond 014 DOZER <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />8.62 <br />$2,068.00 <br />$1,938.00 <br />$1,769.00 <br />$8,232.00 <br />$1,682.00 <br />$6,046.00 <br />$750.00 <br />$729.00 <br />$11,765.00 <br />Rip BB Road Detour RIPPER <br />7.47 <br />Haul BB Road surface material to pit TRUCKI <br />2.06 <br />Haul BB Road Fill Material SCRAPER1 <br />4.79 <br />Rip NE Haul Road surface RIPPER <br />6.53 <br />Re rade NE Haul Road corridor DOZER <br />25.19 <br />Finish grade BB Road detour corridor GRADER <br />6.37 <br />Ri BB Detour Rd Topsoil -Slash M RIPPER <br />2.81 <br />Haul BB Detour Rd Bench 1 Material -Slash M SCRAPERl <br />6.84 <br />SUBTOTALS: <br />70.68 <br />$34,979 <br />INDIRECT COSTS <br />$706.58 <br />OVERHEAD AND PROFIT: <br />$367.28 <br />Liability insurance: <br />2.02 <br />Performance bond: <br />1.05 <br />Job superintendent: <br />35.34 <br />Profit: <br />10.00 <br />Total = <br />$706.58 <br />Total = <br />$367.28 <br />Total = <br />$2,632.12 <br />Total = <br />$3,497.90 <br />TOTAL O & P = <br />$7,203.88 <br />CONTRACT AMOUNT (direct + O & P) = <br />$42,182.88 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 <br />Engineering work and/or contract/bid preparation: 4.61 <br />Reclamation management and/or administration: 3.58 <br />CONTINGENCY: 0.00 <br />Total = 0.00 <br />Total = $1,944.63 <br />$1,510.15 <br />Total = $0.00 <br />TOTAL INDIRECT COST = $10,658.66 <br />TOTAL BOND AMOUNT (direct + indirect) = $45,637.66 <br />