My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-03_INSPECTION - M2007013 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007013
>
2017-01-03_INSPECTION - M2007013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:40:18 AM
Creation date
1/4/2017 10:36:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
Inspection
Doc Date
1/3/2017
Doc Name
Inspection Report
From
DRMS
To
McAtee Construction Company
Inspection Date
12/19/2016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BULLDOZER WORK <br /> <br />Task description: Backfill 840 foot Vertical Highwall <br />Site: Bollish Pit #2 Permit Action: Dec. 2016 Inspection Permit/Job#: M2007013 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 001 State: Colorado Abbreviation: None <br />Date: 1/3/2017 County: Logan Filename: M013-001 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D9T - 9SU <br />Horsepower: 405 <br />Blade Type: Semi-Universal <br />Attachment: 3-shank ripper <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: <br /> Utilization % <br />Ownership Cost/Hour: $97.48 NA <br />Operating Cost/Hour: $103.60 100 <br />Ripper own. <br />Cost/Hour: $10.74 NA <br />Ripper op. Cost/Hour: $0.99 15 <br />Operator Cost/Hour: $38.89 NA <br />Total unit Cost/Hour: $251.70 <br />Total Fleet Cost/Hour: $503.40 <br /> <br />MATERIAL QUANTITIES <br />Initial Volume: 29,167 <br />Swell factor: 1.180 <br />Loose volume: 34,417 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell <br />factor: <br />Cat Handbook <br /> <br />HOURLY PRODUCTION <br />Average push distance: 80 feet <br />Unadjusted hourly <br />production: <br />1,460.1 LCY/hr <br /> <br />Materials consistency <br />description: <br />Compacted fill or embankment 0.9 <br /> <br />Average push <br />gradient: <br />-30 % <br />Average site altitude: 4,100 feet <br /> <br />Material weight: 4,050 lbs/LCY <br /> <br />Weight description: Sand and clay - Compacted
The URL can be used to link to this page
Your browser does not support the video tag.