My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-01-03_INSPECTION - M2007013 (2)
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007013
>
2017-01-03_INSPECTION - M2007013 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2017 11:40:18 AM
Creation date
1/4/2017 10:36:46 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007013
IBM Index Class Name
Inspection
Doc Date
1/3/2017
Doc Name
Inspection Report
From
DRMS
To
McAtee Construction Company
Inspection Date
12/19/2016
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST SUMMARY WORK <br /> <br />Task description: Cost Summary <br />Site: Bollish Pit #2 Permit Action: Dec. 2016 Inspection Permit/Job#: M2007013 <br /> <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado Abbreviation: None <br />Date: 1/3/2017 County: Logan Filename: M013-000 <br />User: JLE <br />Agency or organization name: DRMS <br /> <br />TASK LIST (DIRECT COSTS) <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br /> <br />Cost <br />001 Backfill 840 foot Vertical Highwall DOZER 2 19.28 $9,704.00 <br />002 Spread Topsoil SCRAPER1 1 8.12 $5,552.00 <br />003 Revegetation of Affected Area REVEGE 1 4.50 $6,782.00 <br />004 Mobilization MOBILIZE 1 2.58 $5,840.00 <br /> <br /> <br /> <br />SUBTOTALS: <br /> <br /> <br />34.48 <br /> <br />$27,878 <br /> <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 Total = $563.14 <br />Performance bond: 1.05 Total = $292.72 <br />Job superintendent: 17.24 Total = $1,284.04 <br />Profit: 10.00 Total = $2,787.80 <br /> TOTAL O & P = $4,927.70 <br /> CONTRACT AMOUNT (direct + O & P) = $32,805.70 <br /> <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 0.00 Total = 0.00 <br />Engineering work and/or contract/bid preparation: 0.00 Total = $0.00 <br />Reclamation management and/or administration: 5.00 $1,640.29 <br /> <br />CONTINGENCY: 0.00 Total = $0.00 <br /> <br />TOTAL INDIRECT COST = $6,567.99 <br /> <br />TOTAL BOND AMOUNT (direct + indirect) = $34,445.99 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.