Laserfiche WebLink
Technical Memorandum  <br />Newmont CC&V Gold Mine  <br />East Cresson Overburden Storage Area Stability Review/Update  <br />NewFields Job No. 475.0106.005  <br />9 December 2016  <br />  <br />  <br />Page 6  <br />Table 2.2  <br />Calculated Factors of Safety  <br />Failure Section Failure  <br />Mode Static  <br />Pseudo‐Static  <br />(Operational  <br />Conditions)  <br />Pseudo‐Static  <br />(Closure  <br />Conditions)  <br />Section 1   Global 1.9 1.6 1.4  <br />Section 2   Global 2.0 1.6 1.4  <br />Section 3   Global 1.5 1.4 1.2  <br />Section 4  Global 2.3 2.1 1.9  <br />  <br />4.0 SUMMARY  <br />Newmont’s CC&V mine plans to increase the storage capacity of the ECOSA by raising the  <br />permitted crest elevation from 10,565 to 10,960‐feet amsl.  NewFields completed a stability  <br />analysis  for  static  and  pseudostatic  conditions  to  evaluate  the  stability  of  the  revised  <br />configuration for global failures under operational and closure conditions.  Based on the results  <br />of the stability evaluation, the larger ECOSA will remain stable under both static and dynamic  <br />conditions.    <br />If you have any questions or require additional information, please contact the undersigned.  <br />Sincerely,  <br />  <br />NewFields Mining Design & Technical Services        <br />  <br />  <br />  <br />  <br />  <br />Nicholas T. Rocco, Ph.D., P.E.      Jay Janney‐Moore, P.E.  <br />Project Manager       Project Manager  <br />  <br />NTR/JNM/ntr  <br />  <br />Attachments: Figure 1‐5; Attachment A  <br />  <br />Addressee:  (via e‐mail)  <br />  <br />P:\Projects\0106.005 CCV Slope Stability & Water Balance\J‐REPORTS\TM_ECOSA_Stability_Rev3.docx  <br />