Laserfiche WebLink
  <br />Page 1  <br />TECHNICAL MEMORANDUM  <br />  <br />  <br />To:  Ron DiDonato  <br />From:   NewFields MDTS  <br />Project:  Squaw Gulch VLP  <br />Project No:  475.0106.006  <br />Subject:  Solution Collection Piping Modifications  <br />Date: 22 August 2016  <br />  <br />  <br />This memo is to provide engineering acceptance for the following design changes:  <br /> As shown in Figure 1, the twin 24” diameter solution collection pipes can be reduced to twin  <br />12” diameter solution pipes at an elevation of 9850’ and higher.  <br /> Revising the alignment of the Barren Pipe along the Mill Platform.  <br /> As shown in Figure 2, the construction of the 12” diameter perimeter drain along the mill  <br />platform is not required.  <br />1.0 REDUCING THE SIZE OF THE TWIN 24” DIAMETER SOLUTION COLLECTION PIPES  <br />NewFields was requested to evaluate the possibility of reducing the twin 24” diameter solution  <br />collection pipes to twin 12” diameter solution collections pipes above the 9850’ construction  <br />bench, as shown in Figure 1.  <br />NewFields  completed  a  review  of  the  high  volume  solution  collection  piping  calculations,  <br />located in Appendix C.8 of the Cripple Creek & Victor Golding Mining Company Squaw Gulch  <br />Valley Leach Facility Design, dated September 1, 2011, and updated the design flow for the  <br />pipes in question using the following values:  <br /> Area of application contribution above the 9850’ construction bench is 660,282 ft2.  <br /> Mean slope of the area of application is 40.13%.  <br /> Maximum solution application rate is 0.003 gpm/ft2 (6.68 x 10‐6 cfs/ft2).    <br />Using the values list above, Newfields calculated the maximum flowrate that could potentially  <br />report to the twin pipes at the 9850’ construction bench.  The design maximum flowrate was  <br />9400 Station Street, Suite 300  <br />Lone Tree, CO 80124  <br />  <br />T: 720.508.3300  <br />F: 720.508.3339