My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (23)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:51:32 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Photographic Documentation
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Complection <br />Photograph Log <br />PHOTO <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />21 Geomembrane Pressure Testing July 1, 2016 11 <br />22 Placement of 793 Berm Over Finished Drain Cover Fill July 8, 2016 11 <br />23 Geomembrane Destructive Testing July 14, 2016 12 <br />24 Soil Liner Fill Moisture Conditioning and Placement July 15, 2016 12 <br />25 Soil Liner Fill Nuclear Density Testing July 18, 2016 13 <br />26 Extrusion Seaming the Tie In July 20, 2016 13 <br />27 Soil Liner Fill Compaction July 27, 2016 14 <br />28 Geomembrane Vacuum Testing July 30, 2016 14 <br />29 Geomembrane Deployment Activities August 2, 2016 15 <br />30 Drain Cover Fill Placement August 12, 2016 15 <br />31 Drain Cover Fill Haul Route Construction August 26, 2016 16 <br />32 Leak Location Services Survey Set Up August 30, 2016 16 <br />33 Leak Detection Sump Installation August 31, 2016 17 <br />34 Collecting Drain Cover Fill Record Sample September 6, 2016 17 <br />35 Backfill Anchor Trench September 12, 2016 18 <br />36 100 mil LLDPE Geomembrane Deployment at South Perimeter <br />Berm September 14, 2016 18 <br />37 Drain Cover Fill Placement September 27, 2016 19 <br />38 Drain Cover Fill Placement October 5, 2016 19 <br />Page 2 of 2
The URL can be used to link to this page
Your browser does not support the video tag.