Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Complection <br />Photograph Log <br />PHOTO  <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />21 Geomembrane Pressure Testing  July 1, 2016 11 <br />22 Placement of 793 Berm Over Finished Drain Cover Fill  July 8, 2016 11 <br />23 Geomembrane Destructive Testing July 14, 2016 12 <br />24 Soil Liner Fill Moisture Conditioning and Placement July 15, 2016 12 <br />25 Soil Liner Fill Nuclear Density Testing July 18, 2016 13 <br />26 Extrusion Seaming the Tie In July 20, 2016 13 <br />27 Soil Liner Fill Compaction July 27, 2016 14 <br />28 Geomembrane Vacuum Testing July 30, 2016 14 <br />29 Geomembrane Deployment Activities August 2, 2016 15 <br />30 Drain Cover Fill Placement August 12, 2016 15 <br />31 Drain Cover Fill Haul Route Construction August 26, 2016 16 <br />32 Leak Location Services Survey Set Up August 30, 2016 16 <br />33 Leak Detection Sump Installation  August 31, 2016 17 <br />34 Collecting Drain Cover Fill Record Sample September 6, 2016 17 <br />35 Backfill Anchor Trench September 12, 2016 18 <br />36 100 mil LLDPE Geomembrane Deployment at South Perimeter  <br />Berm September 14, 2016 18 <br />37 Drain Cover Fill Placement September 27, 2016 19 <br />38 Drain Cover Fill Placement October 5, 2016 19 <br />Page 2 of 2