My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (23)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (23)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:51:32 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Photographic Documentation
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Complection <br />Photograph Log <br />PHOTO <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />1 Soil Liner Fill Placement October 13, 2015 1 <br />2 Geomembrane Deployment Activities November 4, 2015 1 <br />3 Snow Removal Activities November 13, 2015 2 <br />4 Extrusion Seaming the Tie In December 3, 2015 2 <br />5 Drain Cover Fill Placement December 10, 2015 3 <br />6 Leak Detection Trench Excavation March 9, 2016 3 <br />7 Excavation near Existing Anchor Trench in Preparation for SLF <br />Placement March 21, 2016 4 <br />8 SLF Placement in Preparation for Phase 1 Leak Detection <br />Trench Installation April 7, 2016 4 <br />9 Drain Cover Fill Placement April 25, 2016 5 <br />10 Structural Fill Placement and Slope Contouring May 5, 2016 5 <br />11 Leak Detection Trench Construction May 5, 2016 6 <br />12 Nondestructive Testing on Non‐Defect Geomembrane Repairs May 16, 2016 6 <br />13 Survey of High Volume Solution Collection Piping May 23, 2016 7 <br />14 SLF Placement and Compaction May 31, 2016 7 <br />15 SLF Depth Verification June 4, 2016 8 <br />16 Unloading Geomembrane Delivery June 8, 2016 8 <br />17 Geomembrane Fusion Seaming June 18, 2016 9 <br />18 Mill Slope Subgrade Preparation June 21, 2016 9 <br />19 Geomembrane Exposure at Mill Tie‐in June 27, 2016 10 <br />20 Anchor Trench Excavation June 29, 2016 10 <br />Page 1 of 2
The URL can be used to link to this page
Your browser does not support the video tag.