Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Complection <br />Photograph Log <br />PHOTO  <br />NUMBER PHOTOGRAPH DESCRIPTION DATE TAKEN PAGE <br />1 Soil Liner Fill Placement October 13, 2015 1 <br />2 Geomembrane Deployment Activities November 4, 2015 1 <br />3 Snow Removal Activities November 13, 2015 2 <br />4 Extrusion Seaming the Tie In December 3, 2015 2 <br />5 Drain Cover Fill Placement December 10, 2015 3 <br />6 Leak Detection Trench Excavation March 9, 2016 3 <br />7 Excavation near Existing Anchor Trench in Preparation for SLF  <br />Placement March 21, 2016 4 <br />8 SLF Placement in Preparation for Phase 1 Leak Detection  <br />Trench Installation April 7, 2016 4 <br />9 Drain Cover Fill Placement April 25, 2016 5 <br />10 Structural Fill Placement and Slope Contouring May 5, 2016 5 <br />11 Leak Detection Trench Construction May 5, 2016 6 <br />12 Nondestructive Testing on Non‐Defect Geomembrane Repairs  May 16, 2016 6 <br />13 Survey of High Volume Solution Collection Piping May 23, 2016 7 <br />14 SLF Placement and Compaction May 31, 2016 7 <br />15 SLF Depth Verification June 4, 2016 8 <br />16 Unloading Geomembrane Delivery June 8, 2016 8 <br />17 Geomembrane Fusion Seaming June 18, 2016 9 <br />18 Mill Slope Subgrade Preparation June 21, 2016 9 <br />19 Geomembrane Exposure at Mill Tie‐in  June 27, 2016 10 <br />20 Anchor Trench Excavation June 29, 2016 10 <br />Page 1 of 2