My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:56:27 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. amec <br />SQUAW GULCH VLF WEEKLY REPORT foster <br />wheeter <br />CQA ACTIVITIES: <br />1) Meld Activities: <br />The following activities were observed: Underground Working remediation; Structural Fill; Phase 2 <br />Diversion Channel, Rip Rap and pump monitoring at the LVSCS riser pipes. <br />11) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. Sampled and shipped 5 resin lots of geogrid for conformance testing. <br />The following samples were collected: Cameron — Soil �iner Fill; SLF-206-C <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held January 05, 2016 (Amec Foster Wheeler, CC&V, Ames). <br />➢ Ames daily safety meetings <br />Amec Foster Wheeler daily safety meetings <br />Contractor risk assessment and SOP development meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: Date: January 11, 2016 <br />Bobby Redd, El <br />Project Resident <br />CC&V Projects <br />Reviewed By: Date: �th114 <br />Reviewed By: Date: <br />
The URL can be used to link to this page
Your browser does not support the video tag.