Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Soil Liner Fill: <br />Cameron SLF processing continued. <br />Drain Cover Fill: <br />None. <br />Rip Rap: <br />Rip rap was placed in the Phase 2 diversion channel between stations S42+00 to S46+00. <br />Underground Workings: <br />Confirmatory Drilling: <br />None. <br />Remediation: <br />UG# 6673:Cat dozers,a Cat skidsteer and a Cat smooth drum roller graded and <br />compacted subgrade for geogrid per project plans and specifications.Completed <br />placement of first geogrid layer on approved subgrade. Began placement of first 6-inch <br />lift of Select Structural Fill.Further remediation required. <br />UG# 6468: Verified that concrete plug met strength requirements and placed cemented <br />rock fill to complete remediation. Site was backfilled and compacted per project plans <br />and specifications. <br />UG# 6678: Verified that concrete plug met strength requirements and placed cemented <br />rock fill to complete remediation.Site was backfilled and compacted per project plans <br />and specifications. <br />UG# 6542: Verified that concrete plug met strength requirements and placed cemented <br />rock fill to complete remediation. Site was backfilled and compacted per project plans <br />and specifications. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />None. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.