Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Underground Workings: <br />Blasting: <br />None. <br />Confirmatory Drilling: <br />UG #6477: Sandvik 700 –8.0 hours,1000LF. Further remediation required. <br />Remediation: <br />UG# 6679: A John Deere excavator removed shot rock in preparation for geogrid <br />subgrade. Further remediation required. <br />UG #6455 & UG #6456: A Cat excavator and Cat dozers removed shot rock in <br />preparation for geogrid subgrade. Further remediation required. <br />Underdrain System: <br />Primary Underdrain:Complete. <br />Secondary Underdrain:None. <br />Tertiary Underdrain:None. <br />Leak Detection: <br />None. <br />Geomembrane: <br />None. <br />Miscellaneous: <br />None. <br />II)Storm Water Management <br />Best Management Practices (BMPs)continued to be performed.