Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Owner:Cripple Creek & Victor Gold Mining Co.Project Number:74201125N0 <br />Project:Squaw Gulch Valley Leach Fill (VLF)Week Ending:February 6, 2016 <br />Location:Cripple Creek & Victor Gold Mine, CO <br />Contractor:Ames Construction, Inc. <br />Reporting Period:01.31.2016 through 02.06.2016 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs:21°F to 33°F Cloud Cover:Partly Cloudy to Mostly Cloudy <br />Lows:-2°F to 12°F Precipitation:Snow <br />Wind:Moderate to strong <br />Ames:Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning:Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I)Earthworks <br />**Amec Foster Wheeler field professional monitored fill material temperatures during fill placement. <br />Average temperatures were above 32°F.All construction materials placed were verified as <br />suitable, and construction methods were in accordance with project technical specifications.** <br />A)VLF (PSSA,Phase 1,and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />Cat dozers graded slopes in the vicinity of stations I32+00 and M10+00 to M20+00.A Cat <br />smooth drum roller compacted the fill areas. <br />All of the above Structural Fill material was placed,compacted, and graded per the project plans <br />and specifications. <br />Soil Liner Fill: <br />None. <br />Rip Rap: <br />None. <br />Days S M T W T F S <br />Work Shifts D <br />D=Day Shift N=Night Shift W=Weather