Laserfiche WebLink
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. amec <br />SQUAW GULCH VLF WEEKLY REPORT foster <br />wheeler <br />11) Storm Water Management <br />Best Management Practices (BMPs) continued to be performed. <br />CQA ACTIVITIES: <br />1) Field Activities: <br />The following activities were observed: underground Working remediation; Structural Fill; Leak Detection; <br />rip rap; and pump monitoring at the LVSCS riser pipes. <br />11) Laboratory Activities: <br />Concrete testing (ADR2), atterberg limits, moisture, compaction, permeability and sieve analysis testing <br />continued. <br />General Project Items <br />Meetings and Discussions: <br />The Weekly Contractor Meeting was held January 26, 2016 (Amec Foster Wheeler, CC&V, Ames). <br />➢ Ames daily safety meetings <br />➢ Amec Foster Wheeler daily safety meetings <br />Summary of Concerns: None. <br />CC&V: Daily updates, reporting, and scheduling occurred between CC&V Projects, Amec Foster <br />Wheeler, and Ames. <br />Deliveries: None. <br />CQA Monitor <br />Submitted by: Date: February 08, 2016 <br />Bobby Redd, EI <br />Project Resident <br />CC&V Projects <br />Reviewed By: <br />Date: Z q <br />Reviewed By: Date: <br />