My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (38)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (38)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:56:27 AM
Creation date
12/22/2016 8:21:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Weekly Reports
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
387
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CRIPPLE CREEK & VICTOR GOLD MINE <br />NEWMONT MINING CO. <br />SQUAW GULCH VLF WEEKLY REPORT <br />Owner:Cripple Creek & Victor Gold Mining Co.Project Number:74201125N0 <br />Project:Squaw Gulch Valley Leach Fill (VLF)Week Ending:January 30, 2016 <br />Location:Cripple Creek & Victor Gold Mine, CO <br />Contractor:Ames Construction, Inc. <br />Reporting Period:01.24.2016 through 01.30.2016 <br />Ambient Temperature Ranges During Week Weather Conditions During Week: <br />Highs:26°F to 44°F Cloud Cover:Partly Cloudy to Mostly Cloudy <br />Lows:4°F to 26°F Precipitation:Snow <br />Wind:Moderate to strong <br />Ames:Continuing construction tasks for the Valley Leach Facility (VLF). <br />Planning:Continuing construction activities and scheduling for the VLF. <br />CONSTRUCTION ACTIVITIES AND PROGRESS: <br />I)Earthworks <br />**Amec Foster Wheeler field professional monitored fill material temperatures during fill placement. <br />Average temperatures were above 32°F.All construction materials placed were verified as <br />suitable, and construction methods were in accordance with project technical specifications.** <br />A)VLF (PSSA,Phase 1,and 2) <br />Structural Fill: <br />The following Structural Fill haul to fill and grading activities occurred: <br />Cat dozers graded slopes in the vicinity of stations K8+00 to K23+00 and M14+00 to M20+00.A <br />Cat smooth drum roller compacted the fill areas. <br />All of the above Structural Fill material was placed,compacted, and graded per the project plans <br />and specifications. <br />Soil Liner Fill: <br />Cameron SLF processing continued. <br />Rip Rap: <br />Continued rip rap placement in the vicinity station S32+00 per project plans and specifications.A <br />Cat loader, a Cat dozer and Cat 740 haul trucks removed excess rip rap and waste from the <br />stockpile and relocated it near station Q22+00. <br />Days S M T W T F S <br />Work Shifts D D D D <br />D=Day Shift N=Night Shift W=Weather
The URL can be used to link to this page
Your browser does not support the video tag.