My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01050.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />June 15, 2016 <br /> <br /> <br /> <br />Page 3 <br />C. Submittal <br />CONTRACTOR will submit completed as‐built documentation within seven (7) <br />calendar days upon completion of the work in the following manner: <br />1. Submit two (2) hard copies to the MANAGER. <br />2. Submit two (2) non‐reproducible copies to the MANAGER in electronic form on <br />compact disks (CD) or DVD’s and in an AutoCAD compatible format. <br />D. The CONTRACTOR will be responsible for performing the following survey activities <br />associated with the Construction Certification Report: <br />1. Provide northing, easting, and elevation for all Soil Liner Fill depth verifications. <br />2. Provide northing, easting, and elevation for geomembrane panel intersections <br />and destructive samples. <br />3. Provide continuous northing, easting, and elevation reference for field testing <br />and sampling location identification. <br />4. Provide depth verification for the Low Volume Solution Collection Fill on a 50‐ <br />foot by 50‐foot grid with additional points at all grade breaks. <br />5. Provide depth verification for Drain Cover Fill on a 50‐foot by 50‐foot grid with <br />additional survey points at all breaks in grade. <br />6. Provide northing, easting and elevation reference for any underground working <br />confirmatory drillhole and blasthole locations. <br />Northings, eastings, and elevations for Items 1, 2, 3 and 6 will be performed on a <br />daily basis and results will be provided to the MANAGER in both electronic and <br />hardcopy format within 24 hours of performing the survey. <br />
The URL can be used to link to this page
Your browser does not support the video tag.