Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01050.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 2  <br />change in fill or synthetic material type, and any other aspect of the work to facilitate  <br />construction and as required by the MANAGER.  <br />B. Submittals By CONTRACTOR Upon Completion of Work:  <br />Within seven (7) calendar days after completion of the WORK, CONTRACTOR shall  <br />furnish MANAGER with "Record Drawings" (also referred to as "As‐Built Drawings") of  <br />the Work. The Record Drawing will be drawn at a scale of 1‐inch equals 100 feet with  <br />10 foot topographic contour interval, and on a 24‐inch by 36‐inch sheet. All surveying  <br />Record Drawings shall be signed and sealed by the Colorado licensed surveyor who  <br />directed the work.  The required surveying shall be carried out on a 100‐foot by 100‐ <br />foot  grid  with  additional  survey  points  required  to  define  valley  leach  facility  <br />topographic  features  (i.e.,  toe of  slope,  crest  of  slope,  breaks in grade), unless  <br />otherwise directed by MANAGER. The Record Drawings shall include elevations and  <br />locations for the following:  <br /> Underdrain plan view showing the limits of the valley leach facility. Underdrain Fill  <br />and underdrain alignment, with elevations every approximately 100 feet or on every  <br />break in grade  <br /> Diversion channel plan and profile view along the diversion channel alignment  <br /> Leak detection trench plan view showing the limits of the valley leach facility, leak  <br />detection  trench  alignment,  and  leak  detection  sumps,  with  elevations  every  <br />approximately 100‐feet  <br /> Soil Liner Fill plan view showing the limits of the valley leach facility,  with contours  <br />of the Soil Liner Fill and Bedding Fill surface on a 10‐foot contour interval, including  <br />the regraded ore slopes and end berms  <br /> Low Volume Solution Collection piping plan showing the limits of the composite  <br />liner,  double  liner  and  single  liner,  and  piping  alignment  with  elevations  every  <br />approximately 100 feet  <br /> Perimeter access roads  <br /> Top of Upper geosynthetics in the Pregnant Solution Storage Area, including the  <br />Vertical Riser Sump and base plates  <br /> High Volume Solution Collection piping plan showing the limits of the VLF, and piping  <br />alignment with elevation every approximately 100‐feet  <br />In addition, the Colorado licensed surveyor will provide a surveyor's certificate to be  <br />submitted in the Construction Certification Report.