Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 00508.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 2  <br />C. Leveling pad  <br />a. The leveling pad shall be continuous over the wall length.  <br />b. Concrete for the pad shall be per the Colorado Department of Transportation’s  <br />Class B Concrete.  <br />D. Spacer block  <br />a. The spacer block shall be used to secure the first row of longitudinal timber facing  <br />units.  <br />E. Material Properties  <br />a. The spacer block shall be Western Larch or Coastal Region Douglas Fir No. 1 Grade  <br />or  better,  conforming  to  current  WWPA  grading  rules  for  western  lumber  or  <br />current WCCIB standard grading rules for west coast lumber.  <br />b. The spacer block shall be incised and pressure treated in accordance with AWPA C‐ <br />14 for solid sawn members using:  <br />i. Pentachlorophenal meeting AWAP P‐8 using AWPA P‐9 type A solvent to a net  <br />minimum retention of 0.6 lb/ft3 or  <br />ii. Copper  naphthenate  meeting  AWPA  P‐8  using  AWPA  P‐9  type  A  solvent  <br />containing a minimum of 2% copper metal to a net retention of 0.075 lb/ft3.  <br />c. Structural  steel  shall  meet  AASHTO  M270  Grade  50W  and  shall  be galvanized  <br />according to ASTM A153.  <br />d. All bolts, lag screws, dowels and spikes shall conform to ASTM A307 and shall be  <br />galvanized according to ASTM A153.  <br />