Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 00508.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 1  <br />SECTION 00508.0 TIMBER WALL FACING  <br />1. PART 1:  GENERAL  <br />1.1. Scope  <br />The CONTRACTOR shall be responsible for removal and salvage of existing crib wall timbers,  <br />transportation of timbers to new wall location, and installation of the timbers as a wall facing  <br />for  the  MSE  wall.  Design  concepts  are  provided  in  the  plan  documents  for  timber  facing  <br />connections, but the CONTRACTOR is responsible for the final connection scheme.  <br />1.2. Construction Sequence  <br />A. A  pre‐construction  conference  is  required  before  construction  begins.  At  this  <br />conference, the CONTRACTOR shall have a plan prepared for the staging/timing of the  <br />construction sequences; means, methods, and details showing the connection of the  <br />timbers to the MSE facing; details showing timber spiking plan; and product details for  <br />all steel, timber and concrete being used. The DESIGN ENGINEER shall approve these  <br />details prior to the CONTRACTOR ordering and fabricating any components.  <br />B. After the original SH 67 is permanently closed to traffic, remove the existing crib wall,  <br />salvaging  reusable  timbers.  During  removal  operations,  the CONTRACTOR shall  <br />consider how to reassemble the timbers as shown on the plans. Consider tagging and  <br />photographing the existing wall in its current location.  <br />1.3. Facing Requirements  <br />A. The wall facing shall be composed of timbers salvaged from the existing crib wall on  <br />SH  67.  <br />a. Prior to placement, the CONTRACTOR shall verify that the timbers used are free of  <br />rot, deterioration, and major longitudinal or transverse cracking.  <br />b. Longitudinal  timbers  shall  be  at  least  8  feet  long  and  shall  be connected to a  <br />minimum  of  two  transverse  timber‐facing  units.  See  the  plan  documents  for  <br />details.  <br />c. Transverse timbers shall be cut from existing historic timbers and shall overhang  <br />the longitudinal members a minimum of 4 inches.  <br />B. Connections  <br />a. Connect longitudinal timbers to the MSE facing in at least four locations per timber.  <br />Connections will consist of a galvanized metal strap secured to the MSE facing and  <br />to the longitudinal timbers. The ENGINEER shall approve the connection details.  <br />b. Transverse timber facing units shall be secured in at least one place with a drive  <br />spike to the timber below.