Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 02200.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />June 15, 2016  <br />  <br />  <br />  <br />Page 1  <br />SECTION 02200.0 EARTHWORKS  <br />1. PART 1:  GENERAL  <br />1.1. Summary  <br />This SPECIFICATION describes site preparation, excavation, stockpiling of soils for earthwork if  <br />necessary,  and  placement  of  Structural  Fill,  Select  Structural Fill,  Coarse  Shaft  Backfill,  <br />Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil Liner  <br />Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material, and Granular Filter Material for  <br />the valley leach facility.  <br />1.2. Related Sections  <br />Refer to the following Sections for related work:  <br /> Section 01050.0 ‐ Staking and Construction Certification Documentation  <br /> Section 02776.0 ‐ Geomembrane  <br /> Section 02777.0 ‐ Geotextile  <br />1.3. Tolerances  <br />A. Limits  of  excavation,  Structural  Fill,  Select  Structural  Fill, Coarse  Shaft  Backfill,  <br />Underdrain Fill, Low Volume Solution Collection Fill, Bedding Fill, Leak Detection Fill, Soil  <br />Liner Fill, Drain Cover Fill, Fine Shaft Backfill, Pipe Bedding Material, and Granular Filter  <br />Material for the valley leach facility are defined by the lines and elevations shown on the  <br />DRAWINGS.  All  fill  shall  be  placed  to  the  minimum  thicknesses  shown  on  the  <br />DRAWINGS.  <br />B. Finished grades shown on the DRAWINGS are given in feet, and shall slope uniformly  <br />between  given  spot  and  contour  elevations,  without  sag  or  humps.  All  grades  shall  <br />provide for natural runoff.  <br />C. The Soil Liner Fill and Bedding Fill shall have a minimum thickness of 1.0 foot.  <br />D. The Low Volume Solution Collection Fill will have a minimum thickness of 3.0 feet at all  <br />times, and the Drain Cover fill will have a minimum thickness of 2.0 feet at all times.  <br />E. Clearance of pipes with respect to regulated boundaries will be checked by MANAGER.  <br />If  clearances  are  inadequate, CONTRACTOR shall  backfill  trenches  to  compaction  <br />SPECIFICATIONS and relocate trenches at CONTRACTOR's expense.  <br />F. Correction of over‐excavation and backfilling shall be to CONTRACTOR's account.