My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 12 <br /> date, project name, and location; <br /> summary of construction related activities; <br /> summary of geomembrane deployed (per day); <br /> summary of samples taken and test results; <br /> summary of geomembrane areas completed, and approved for Drain Cover Fill placement; <br /> summary of deficiencies and/or defects and resolutions; and <br /> signature of the CQA Monitor. <br />7.6. Construction Certification Report <br />At the completion of the project, the CQA Monitor shall submit to the MANAGER a <br />Construction Certification Report. This report shall certify that the work has been performed <br />in compliance with the design DRAWINGS and project SPECIFICATIONS and will contain the <br />following information: <br /> summary of all construction activities; <br /> observation and test data sheets; <br /> photographic documentation; <br /> CQA staff scheduling; <br /> copies of weekly reports; <br /> CONTRACTOR'S subgrade acceptance forms; <br /> temperature monitoring results; <br /> geosynthetic quality control documents; <br /> geosynthetic quality assurance documents; <br /> geomembrane installation observations, such as for deployment, trial seams, defect <br />repair, destruct testing and non‐destructive testing; <br /> sampling, testing locations, and test results; <br /> changes to the design DRAWINGS or project SPECIFICATIONS and the justification for <br />these changes; <br /> record DRAWINGS; and <br /> a certification statement that construction was completed in compliance with the <br />DRAWINGS and SPECIFICATIONS, signed, and sealed by the CERTIFYING ENGINEER <br />registered in the State of Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.