My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 11 <br />7.1. Daily Record Keeping <br />The CQA Monitor shall keep daily records consisting of field notes, observation and testing <br />data sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting <br />of construction problems and resolutions. This information shall be submitted on a regular <br />basis to the MANAGER for review. <br />7.2. Geosynthetic Observation and Testing Forms <br />The CQA Monitor shall document geosynthetic observations and test results on forms which <br />include the following information: <br /> date, project name, location, and weather data; <br /> identification of panel or seam numbers; <br /> description of ongoing construction, detailing deployment areas; <br /> numbering system identifying test or sample number; <br /> location and identification of repairs and date of repair; <br /> length and/or thickness measurements for geomembrane panels or seams; <br /> welding machine temperatures and settings; <br /> welding machine and technician identifications; <br /> location of tests and test results; <br /> identification of testing technicians and time of tests; and <br /> signature or initials of the CQA Monitor. <br />7.3. Photo Documentation <br />The CQA Monitor shall photograph all phases of construction. <br />7.4. Design And Specification Changes <br />During construction, the need to address design and SPECIFICATION changes, modifications, or <br />clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will <br />notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION changes <br />shall only be made with written agreement from the MANAGER and DESIGN ENGINEER. <br />7.5. Weekly Progress Reports <br />The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA <br />activities. This report shall be submitted to the MANAGER and shall include the following <br />information:
The URL can be used to link to this page
Your browser does not support the video tag.