Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 11  <br />7.1. Daily Record Keeping  <br />The CQA Monitor shall keep daily records consisting of field notes, observation and testing  <br />data sheets, summary of the daily meeting with the INSTALLER or CONTRACTOR, and reporting  <br />of construction problems and resolutions.  This information shall be submitted on a regular  <br />basis to the MANAGER for review.  <br />7.2. Geosynthetic Observation and Testing Forms  <br />The CQA Monitor shall document geosynthetic observations and test results on forms which  <br />include the following information:  <br /> date, project name, location, and weather data;  <br /> identification of panel or seam numbers;  <br /> description of ongoing construction, detailing deployment areas;  <br /> numbering system identifying test or sample number;  <br /> location and identification of repairs and date of repair;  <br /> length and/or thickness measurements for geomembrane panels or seams;  <br /> welding machine temperatures and settings;    <br /> welding machine and technician identifications;  <br /> location of tests and test results;  <br /> identification of testing technicians and time of tests; and  <br /> signature or initials of the CQA Monitor.  <br />7.3. Photo Documentation  <br />The CQA Monitor shall photograph all phases of construction.  <br />7.4. Design And Specification Changes  <br />During construction, the need to address design and SPECIFICATION changes, modifications, or  <br />clarifications may arise. In such cases the CQA Monitor shall notify the MANAGER, which will  <br />notify the DESIGN ENGINEER and CERTIFYING ENGINEER. Design and SPECIFICATION changes  <br />shall only be made with written agreement from the MANAGER and DESIGN ENGINEER.  <br />7.5. Weekly Progress Reports  <br />The CQA Monitor shall prepare weekly progress reports summarizing all construction and CQA  <br />activities.  This  report  shall  be  submitted  to  the MANAGER  and  shall  include  the  following  <br />information: