My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400‐2.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 1 <br />SECTION 01400.2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN <br />1. PART 1: INTRODUCTION <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of <br />the geosynthetic components used for the construction of the valley leach facility at the <br />Cresson Project, Teller County, Colorado. This program has been developed to assure that <br />the construction of the geosynthetic components are in compliance with the project <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are <br />achieved. <br />The objective of this plan is to assure that proper materials, construction techniques, and <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. This <br />program also intends to identify problems that may occur during construction and provide the <br />means for resolution of these problems. <br />This program addresses quality assurance, not quality control. This CQA Plan is <br />independent of the quality control (QC) programs conducted by the MANUFACTURERS, <br />INSTALLERS, and CONTRACTORS. The intent of the CQA Plan is to provide independent third <br />party verification and testing, to demonstrate that the INSTALLER and CONTRACTORS have <br />met their obligations in the supply and installation of geosynthetic materials according to the <br />design, project SPECIFICATIONS, contractual and regulatory requirements. Quality control is <br />provided by the MANUFACTURERS, INSTALLERS, and CONTRACTORS and refers to those <br />actions taken by them to ensure that their materials and workmanship meet the <br />requirements of the plans and project SPECIFICATIONS. <br />2. PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE <br />The following section provides descriptions of the parties to this CQA plan including their <br />responsibilities and qualifications. <br />2.1. CC&V <br />In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V <br />owns and operates the valley leach facility. <br />2.2. Manager <br />In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple <br />Creek & Victor Gold Mining Company. The MANAGER is the official representative of CC&V <br />responsible for all construction activities including oversight and direction during construction.
The URL can be used to link to this page
Your browser does not support the video tag.