Laserfiche WebLink
Newmont‐Cripple Creek & Victor Gold Mine  <br />Technical Specification No. 01400‐2.DOCX  <br />Squaw Gulch VLF  <br />Project No.475.0106.006  <br />August 25, 2016  <br />  <br />  <br />  <br />Page 1  <br />SECTION 01400.2 GEOSYNTHETIC CONSTRUCTION QUALITY ASSURANCE (CQA) PLAN  <br />1. PART 1:  INTRODUCTION  <br />This plan addresses the construction quality assurance (CQA) procedures for the installation of  <br />the  geosynthetic  components  used  for  the  construction  of  the  valley  leach  facility  at  the  <br />Cresson Project,  Teller County,  Colorado.  This  program  has  been  developed  to  assure  that  <br />the  construction  of  the  geosynthetic  components  are  in  compliance  with  the  project  <br />SPECIFICATIONS and to demonstrate that the regulatory requirements for the construction are  <br />achieved.  <br />The objective of this plan is to assure that proper materials, construction  techniques,  and  <br />procedures are followed by the CONTRACTOR and that the intent of the design is met. This  <br />program also intends to identify problems that may occur during construction and provide the  <br />means for resolution of these problems.  <br />This  program  addresses  quality  assurance,  not  quality  control. This CQA Plan is  <br />independent  of  the  quality  control  (QC)  programs  conducted  by  the MANUFACTURERS,  <br />INSTALLERS, and CONTRACTORS. The intent of the CQA Plan is to provide independent third  <br />party verification and testing, to demonstrate that the INSTALLER and CONTRACTORS have  <br />met their obligations in the supply and installation of geosynthetic materials according to the  <br />design, project SPECIFICATIONS, contractual and regulatory requirements. Quality control is  <br />provided by the MANUFACTURERS, INSTALLERS,  and CONTRACTORS  and  refers  to  those  <br />actions  taken  by  them  to  ensure  that  their  materials  and  workmanship  meet  the  <br />requirements of the plans and project SPECIFICATIONS.  <br />2. PART 2: DESCRIPTION OF PARTIES TO CONSTRUCTION QUALITY ASSURANCE  <br />The  following  section  provides  descriptions  of  the  parties  to  this  CQA  plan  including  their  <br />responsibilities and qualifications.  <br />2.1. CC&V  <br />In this CQA Plan CC&V refers specifically to Cripple Creek & Victor Gold Mining Company. CC&V  <br />owns and operates the valley leach facility.  <br />2.2. Manager  <br />In this CQA Plan the MANAGER refers specifically to the individual appointed by the Cripple  <br />Creek & Victor Gold Mining Company.  The MANAGER is the official representative of CC&V  <br />responsible for all construction activities including oversight and direction during construction.