My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (40)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (40)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:57:20 AM
Creation date
12/22/2016 8:16:17 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - Technical Specifications
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
137
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Newmont‐Cripple Creek & Victor Gold Mine <br />Technical Specification No. 01400.DOCX <br />Squaw Gulch VLF <br />Project No.475.0106.006 <br />August 25, 2016 <br /> <br /> <br /> <br />Page 2 <br />between all parties involved in the project to ensure that ongoing communications are <br />maintained. MANAGER and CERTIFYING ENGINEER shall be responsible for the resolution of all <br />CQA issues. <br />Duties for this position include the following: <br /> review and approval of DRAWINGS and SPECIFICATIONS for all soil components of the valley <br />leach facility; <br /> preconstruction coordination with the CQA Monitor to ensure that the CQA Monitor has <br />performed similar reviews of the DRAWINGS and SPECIFICATIONS to ensure that the CQA <br />Plan can be implemented; <br /> coordination of all construction activities associated with CONTRACTOR; <br /> scheduling and coordinating construction activities with required CQA testing and activities; <br /> overseeing the construction quality control operations performed by CONTRACTOR; <br /> approve specific corrective measures to be implemented during construction when <br />deviations from the SPECIFICATIONS occur; <br /> ensure that required quality assurance testing has been performed in accordance with the <br />CQA Plan and to the satisfaction of the CQA Monitor; and <br /> ensure that the CQA personnel are provided with all documentation required in the CQA <br />Plan and project SPECIFICATIONS. <br />2.3. Design Engineer <br />In this CQA Plan the DESIGN ENGINEER and Engineer of Record (EOR) refers specifically to <br />NewFields who has assumed the role of DESIGN ENGINEER after a thorough review of design <br />documents to include, but not limited to, the DRAWINGS and SPECIFICATIONS. The DESIGN <br />ENGINEER or the CERTIFYING ENGINEER identified in section 2.4 below, is responsible for <br />approving all DRAWING and SPECIFICATION changes, modifications, or clarifications <br />encountered during construction. <br />2.4. Certifying Engineer <br />In this plan, CERTIFYING ENGINEER refers specifically to NewFields. CERTIFYING ENGINEER is <br />the individual or firm responsible for certifying the construction was performed in compliance <br />with the DRAWINGS and SPECIFICATIONS. MANAGER and CERTIFYING ENGINEER shall be <br />responsible for the resolution of all quality assurance issues.
The URL can be used to link to this page
Your browser does not support the video tag.