Laserfiche WebLink
Table 2Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionEarthworks Testing Summary and FrequencyUnderdrain Fill(UF)Select Structural Fill (SSF)Structural Fill (SF)Leak Detection Fill (LDF)Soil Liner Fill (SLF)Drain Cover Fill (DCF)Quantity of Material Placed (cy) 252 63 1,955,187 251 101,690203,380Particle Size Tests Performed 1 1 40 2 2618Specified Particle Size Test Frequency 5,000 50,000 50,000 10,000 4,00020,000Actual Particle Size Test Frequency 252 63 48,880 125 3,911 11,299Atterberg Limit Tests Performed 1 1 40 2 2618Specified Atterberg Limit Test Frequency 5,000 ‐ 50,000 10,000 4,00020,000Actual Atterberg Limit Test Frequency 252 63 48,880 125 3,911 11,299Laboratory Compaction Tests Performed See Note 1 See Note 1 26Specified Compaction Test Frequency 50,000 50,000 4,000Actual Compaction Test Frequency N/A N/A 3,911Permeability Tests Performed26Specified Permeability Test Frequency4,000Actual Permeability Test Frequency3,911Moisture Content Tests Performed 1 1 See Note 1 2 2618Specified Moisture Content Test Frequency 5,000 2,000 2,000 10,000 50020,000Actual Moisture Content Test Frequency 252 63 N/A 125 3,911 11,299Field Nuclear Density Tests Performed See Note 1 See Note 1 266Specified Nuclear Density Test Frequency 2,000 2,000 500Actual Nuclear Density Test Frequency N/A N/A 382Field Depth Verification Tests Performed138Specified Depth Verification Test Frequency2.0 test/acActual Depth Verification Test Frequency2.189Notes:2. All frequencies are based on quantities in cubic yards.3. N/A = Not ApplicableMaterial QuantityNumber of TestsTest FrequencyMaterialN/AN/AN/AN/AN/AN/A1. The method of compaction technique was used in accordance with the project technical specifications due to the large particle size.N/AN/AN/AN/AN/AN/AN/A N/AN/AN/APage 1 of 1