Laserfiche WebLink
Table 1 <br />Cripple Creek & Victor Gold Mining Company <br />Squaw Gulch Valley Leach Facility <br />Phase 1 Completion <br />Summary of Earthworks Material Specifications <br />Sieve Size Percent Passing <br />12 inch 100 <br />No. 200 0‐6 <br />24 inch 100 <br />No. 200 0‐25 <br />1 inch 100 <br />3/8 inch 40‐70 <br />No. 4 5‐50 <br />No. 40 0‐20 <br />No. 200 0‐10 <br />2 inch 100 <br />No. 200 15‐65 <br />1 1/2 inch 100 <br />3/4 inch 70‐100 <br />No. 4 5‐50 <br />No. 200 0‐8 <br />Note: <br />1. NP ‐ Non Plastic <br />2. N/A ‐ Not Applicable <br />Soil Liner Fill <br />(SLF) <br />10  <br />Minimum 1 x 10‐6 <br />Drain Cover Fill <br />(DCF)NP N/A <br />Leak Detection Fill <br />(LDF)NP N/A <br />Underdrain Fill <br />(UF)NP N/A <br />Select Structural Fill <br />(SSF) <br />N/A <br />NP N/A 3 inch 100 <br />30  <br />Maximum <br />Structural Fill <br />(SF) <br />Grain Size Distribution <br />Material Plasticity  <br />Index <br />Permeability  <br />(cm/s) <br />Page 1 of 1