|
Table 11Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionNuclear Gauge Moisture‐Density Testing Summary ‐ Soil Liner FillNORTHING EASTINGSAMPLE NUMBERMAX. DRY DENSITY (pcf)OPTIMUM MOISTURE (%)DRY DENSITY (pcf)MOISTURE CONTENT (%)SPECIFIED COMPACTION (%)COMPACTION (%)1N272 08/10/15 56,895.4 34,300.9 10 1SLF‐30‐R 117.8 13.1 114.3 13.6 95 97.03 Pass1N274 08/10/15 56,790.4 34,166.3 10 1SLF‐30‐R 117.8 13.1 113.6 12.3 95 96.43 Pass1N428 10/03/15 54,566.3 36,198.0 10 1SLF‐45‐R 114.1 13.9 114.6 13.0 95 100+ Pass1N433 10/05/15 55,001.7 36,025.9 10 1SLF‐45‐R 114.1 13.9 113.6 12.5 95 99.56 Pass1N435 10/06/15 55,016.4 36,094.8 10 1SLF‐45‐R 114.1 13.9 113.1 13.3 95 99.12 Pass1N436 10/06/15 55,084.3 35,996.9 10 1SLF‐45‐R 114.1 13.9 111.2 14.5 95 97.46 Pass1N437 10/06/15 55,151.4 36,064.6 10 1SLF‐35‐R 118.2 13.5 122.7 12.8 95 100+ Pass1N438 10/06/15 55,058.9 36,148.0 10 1SLF‐45‐R 114.1 13.9 112.3 13.8 95 98.42 Pass1N439 10/08/15 55,122.7 36,157.4 10 1SLF‐46‐R 113.8 14.9 111.8 13.6 95 98.24 Pass1N440 10/08/15 55,184.7 36,134.2 10 1SLF‐46‐R 113.8 14.9 110.3 14.4 95 96.92 Pass1N441 10/08/15 55,202.3 36,024.3 10 1SLF‐45‐R 114.1 13.9 114.5 12.4 95 100+ Pass1N442 10/08/15 55,291.0 36,071.3 10 1SLF‐45‐R 114.1 13.9 113.1 12.4 95 99.12 Pass1N443 10/08/15 55,310.3 36,143.5 10 1SLF‐35‐R 118.2 13.5 116.8 14.3 95 98.82 Pass1N444 10/08/15 55,250.5 36,209.9 10 1SLF‐46‐R 113.8 14.9 111.1 13.7 95 97.63 Pass1N445 10/10/15 55,336.2 36,214.1 10 1SLF‐45‐R 114.1 13.9 113.1 12.6 95 99.12 Pass1N446 10/10/15 55,407.3 36,188.2 10 1SLF‐45‐R 114.1 13.9 111.9 12.0 95 98.07 Pass1N447 10/10/15 55,509.7 36,164.8 10 1SLF‐35‐R 118.2 13.5 119.9 13.7 95 100+ Pass1N448 10/10/15 55,580.0 36,116.1 10 1SLF‐46‐R 113.8 14.9 112.9 12.9 95 99.21 Pass1N449 10/10/15 55,720.9 36,239.9 10 1SLF‐46‐R 113.8 14.9 115.6 14.4 95 100+ Pass1N450 10/10/15 55,644.4 36,262.3 10 1SLF‐35‐R 118.2 13.5 115.3 13.3 95 97.55 Pass1N451 10/10/15 55,502.8 36,295.1 10 1SLF‐46‐R 113.8 14.9 117.8 13.5 95 100+ Pass1N452 10/13/15 55,618.7 36,317.8 10 1SLF‐46‐R 113.8 14.9 110.0 13.5 95 96.66 Pass1N453 10/13/15 55,685.9 36,367.6 10 1SLF‐35‐R 118.2 13.5 114.0 12.6 95 96.45 Pass1N454 10/13/15 55,745.7 36,349.7 10 1SLF‐35‐R 118.2 13.5 116.5 13.6 95 98.56 Pass1N455 10/13/15 55,846.2 36,315.8 10 1SLF‐35‐R 118.2 13.5 121.3 11.8 95 100+ Pass1N456 10/13/15 55,837.5 36,397.7 10 1SLF‐35‐R 118.2 13.5 117.5 12.9 95 99.41 PassTEST NUMBER DATE TESTEDDEPTH (in)LABORATORYPASS/FAILFIELDLOCATIONPage 1 of 11
|