Laserfiche WebLink
Table 10Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Drain Cover Fill1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #20 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100 ‐ 70‐100 ‐ ‐ 5‐50‐‐‐‐‐0‐8‐‐NPATTERBERG LIMITSSPECIFICATIONGRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGSPECIFICATION ‐ PERCENT PASSINGUSCSELEVATION (FT)NATURAL MOISTURE (%)SAMPLE NUMBERDATE SAMPLEDLOCATIONNFDCF‐13‐R 09/06/16 1 FG 4.0 100 99 87.5 66.5 55.1 38.3 25.8 18.3 14.1 12.1 9.4 7.5 GP‐GM NP NV NPNFDCF‐14‐R 09/22/16 1 FG 5.5 100 97.6 78.5 55.5 46.4 32.3 23.6 17.3 13.4 11.58.9 7.1 GP‐GM NP NV NPNFDCF‐15‐R 10/03/16 1 FG 5.3 100 95.3 79.9 57.7 47.6 30 19.9 14 10.9 9.4 7.4 5.9 GP‐GM NP NV NPPanel P‐2371Panel P‐2264Panel P‐2276NP ‐ Non PlasticNV ‐ No ValuePage 2 of 2Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.