Laserfiche WebLink
Table 9Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Soil Liner Fill2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #20 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXSPECIFICATIONPHASE NORTHING EASTING100‐‐‐‐‐‐‐‐‐‐‐15‐65‐ ‐ 10 MIN.1x10‐61SLF‐1‐R  09/27/14 1 54,431.2 34,891.8 9,530.3 13.5 100 100 91 89 86 84 78 7062 57 55 50 46 SC 17 34 17 113.9 13.6 5.25E‐081SLF‐2‐R  10/27/14 1 55,117.1 35,281.7 9,463.8 14.6 100 98 94 91 86 83 76 68 61 55 53 48 45 SC 18 36 18 115.8 13.8 1.43E‐071SLF‐3‐R  10/27/14 1 55,238.1 35,418.5 9,481.4 10.1 100 98 94 90 86 84 78 70 62 56 54 49 46 SC 18 33 15 115.7 13.7 1.49E‐071SLF‐4‐R  03/28/15 1 55,253.7 34,273.1 9,450.6 13.8 100 97 92 89 83 79 71 64 57 52 50 46 42.3 GC 18 34 16 115.4 13.3 1.91E‐071SLF‐5‐R  04/14/15 1 55,216.4 34,200.1 9,463.5 14.9 100 100 93 90 85 82 77 6962 57 54 50 47 SC 16 36 20 115.5 12.7 7.38E‐071SLF‐6‐R  05/07/15 1 55,628.7 34,117.8 9,578.7 14.3 100 98.9 96.9 94 90.1 88.4 83.4 76.5 69.1 63.3 61.1 56.2 52 CL 14 40 26 115.2 15.1 3.51E‐071SLF‐7‐R 05/21/15 1 54,580.0 35,438.5 9,615.5 13.8 100 100 95.2 91.1 85.5 82.1 71.5 62.3 54.7 49.3 47 41.5 36.4 SC 15 35 20 120.5 12.1 4.69E‐071SLF‐8‐R 05/21/15 1 54,354.3 35,226.9 9,634.3 16.1 100 100 95.8 90.6 83.9 80.4 71.1 61.9 54.8 49.5 47.1 41.7 36 SC 14 33 19 120.5 11.7 1.37E‐071SLF‐9‐R 05/30/15 1 55,860.9 34,732.3 9,497.2 17.6 100 100 96.8 93.8 90.1 87.2 81.7 72.6 65.8 60.8 58.7 54.1 50 CL 14 37 23 113.9 15.3 1.90E‐071SLF‐10‐R 06/09/15 1 55,852.6 34,213.5 9,593.2 14.6 100 99.8 98 95.2 90.8 88.5 83.7 75 68 62.6 60.4 55.5 51.1 CL 16 38 22 113 14.6 2.94E‐071SLF‐11‐R 06/09/15 1 55,365.3 35,454.5 9,458.3 14.9 100 100 96.7 93.5 89.787.5 82.6 74.8 66.9 61.3 59.2 54.6 50.5 CL 15 36 21 114.6 14.1 2.96E‐071SLF‐12‐R 06/16/15 1 56,093.5 34,606.8 9,592.7 17.4 100 100 98 96 92.4 90.485.7 78.1 71.8 67.8 65.2 61 56.8 CL 14 34 20 115.6 14.2 1.73E‐071SLF‐13‐R 06/23/15 1 56,221.0 34,983.3 9,495.9 10.5 100 100 98.2 96.1 93.191.6 87.6 79.8 72.3 66.6 64.3 59.3 55.1 CL 15 36 21 113.8 13.7 2.21E‐071SLF‐14‐R 06/23/15 1 55,899.8 35,421.3 9,470.2 11.7 100 100 97.5 96.2 92.890.5 85.3 78 70.1 64.2 61.8 56.7 52.4 CL 14 35 21 114.4 14.2 7.47E‐071SLF‐15‐R 06/29/15 1 56,695.1 34,558.1 9,630.8 15.5 100 99.6 96.9 94.2 90.5 88.6 84.9 77.6 70.1 64.5 62.2 57.2 53.1 CL 15 36 21 116.6 12.1 2.35E‐071SLF‐16‐R 07/16/15 1 56,766.9 34,213.8 9,724.9 8.9 100 100 96.2 94 88.5 85.2 79.3 72.9 66.1 60.9 58.8 54.2 50.2 CL 13 34 21 112.9 14.4 7.84E‐081SLF‐17‐R 07/16/15 1 54,934.7 35,512.0 9,580.4 12.8 100 99.1 96.7 94.2 90.9 89.1 83.6 77.9 69 61.8 59.1 53.4 48.7 CL 12 35 23 115.9 13.4 8.65E‐071SLF‐18‐R 07/22/15 1 56,664.1 34,241.5 9,738.7 11.2 100 98 98 95.5 92 89.6 84.7 77.3 69.3 63.6 61.4 56.6 52.3 CL 11 35 24 112.1 15.6 1.21E‐071SLF‐19‐R 07/27/15 1 55,934.1 35,808.3 9,496.3 13.5 100 100 99 95.5 92.4 9084.5 77.2 69.9 64.4 62.3 57.2 53.2 CL 11 35 24 116.8 13.9 5.46E‐081SLF‐20‐R 07/27/15 1 55,956.0 33,993.7 9,659.3 13.4 100 100 93.3 90.9 87.184 78.7 72.4 65.9 60.8 58.8 54 50.3 CL 13 34 21 115.2 14.1 4.08E‐071SLF‐21‐R 07/29/15 1 55,968.9 35,640.8 9,492.8 11.6 100 100 91 83.8 80.1 77.8 74.2 68.7 62.4 57.4 55.4 50.6 46.4 SC 12 36 24 118 13.5 1.09E‐071SLF‐22‐R 07/29/15 1 56,078.8 34,090.4 9,663.1 16.3 100 100 98.7 95 91.4 88.5 82.9 76.3 69.2 63.8 61.7 56.5 51.1 CL 13 41 28 111.3 13.3 6.56E‐071SLF‐23‐R 07/29/15 1 56,138.4 34,471.0 9,655.5 13.0 100 100 98.2 97.4 94 90.5 81.5 72.9 65.4 60.2 57.9 52.9 48.7 SC 12 37 25 112.3 15.5 1.36E‐071SLF‐24‐R 07/30/15 1 56,242.9 34,343.2 9,731.5 11.0 100 100 92.6 91.5 88.987.2 81.8 75.1 68 62.4 60.1 54.2 49.2 SC 13 36 23 117.1 14 1.21E‐071SLF‐25‐R 08/03/15 1 54,285.2 35,361.8 9,672.1 14.0 100 99 97 94 89 86 76 67 60 55 52 47 41 SC 17 40 23 118.1 9.7 2.57E‐081SLF‐26‐R 08/03/15 1 54,423.0 35,533.9 9,658.2 12.9 100 100 97 93 91 89 80 7165 58 55 51 46 SC 17 39 22 116.1 11.9 7.10E‐081SLF‐27‐R 08/03/15 1 54,455.5 35,758.8 9,704.8 8.8 100 100 96 93 89 86 78 69 63 58 55 51 46 SC 17 39 22 116.1 11.9 1.77E‐081SLF‐28‐R 08/05/15 1 55,993.9 36,173.7 9,584.0 13.7 100 100 97 95 92 87 78 6961 56 54 50 45 SC 17 39 22 116.9 12.1 ‐1SLF‐29‐R 08/08/15 1 57,220.6 34,557.9 9,635.3 13.9 100 96.1 91.3 88 84.8 82.6 77 70.6 64.1 59.1 57 52.4 48.4 SC 12 35 23 116.1 13.4 7.10E‐071SLF‐30‐R 08/10/15 1 54,733.8 35,910.5 9,688.7 13.8 100 99.1 93.5 90.2 84.8 82 76.2 68.5 60.8 55 52.7 47.7 43.2 SC 13 35 22 117.8 13.1 2.91E‐071SLF‐31‐R 08/13/15 1 55,319.1 36,003.1 9,643.6 13.8 100 99.6 98 94.8 90.8 88.5 84.3 76.5 68.4 62.5 60.2 54.7 51.2 CL 14 35 21 115.2 15.1 5.57E‐071SLF‐32‐R 08/15/15 1 56,148.9 35,412.3 9,529.3 17.1 100 100 94.4 91.7 87.485.5 81.4 72.9 64.8 58.7 56.3 51.2 47 SC 12 35 23 117.2 15.1 4.69E‐081SLF‐33‐R 08/22/15 1 56,408.2 34,097.2 9,790.7 16.3 100 98.4 95.1 92.5 88.1 86.2 82.3 73.7 65.9 60.1 57.7 52.5 48 SC 14 35 21 117 13.5 4.52E‐071SLF‐34‐R 08/22/15 1 57,635.1 34,610.2 9,722.2 15.1 100 100 94.6 91.7 86.484.4 80.8 72 63.3 56.6 54 48.1 43.2 SC 14 37 23 115.2 14.8 2.41E‐071SLF‐35‐R 08/24/15 1 56,660.5 34,070.4 9,774.3 15.7 100 99.7 95.6 92.2 87 84.4 79.6 70.8 64.1 58.8 56.5 51.6 47.3 SC 14 37 23 118.2 13.5 1.21E‐071SLF‐36‐R 08/25/15 1 56,460.0 35,188.1 9,575.0 14.2 100 99.7 95.7 93.2 89.2 87.4 84.1 75 66.1 59.3 56.7 51 46.8 SC 15 37 22 113.9 14.1 2.60E‐071SLF‐37‐R 08/27/15 1 56,802.6 34,765.8 9,594.6 13.4 100 100 95.4 91.5 86.784.9 80.6 72.3 64.9 59.1 56.7 51.3 47.1 SC 14 35 21 115.6 13.8 2.11E‐071SLF‐38‐R 08/27/15 1 57,005.1 34,442.4 9,632.0 16.0 100 99.6 97 94.9 91.5 89.3 85.8 76.2 68.7 62.7 60.3 54.8 50.4 CL 14 33 19 114.7 14.6 3.26E‐081SLF‐39‐R 09/01/15 1 56,214.1 35,909.5 9,632.7 14.3 100 100 95 92 88 86 81 7468 62 59 54 50.1 CL 19 37 18 115.7 12.7 5.52E‐081SLF‐40‐R 09/01/15 1 56,514.0 35,331.6 9,641.0 12.3 100 98 95 93 89 87 82 73 67 60 58 53 48.9 SC 18 35 17 116.1 12 6.81E‐07PERMEABILITY (k=cm/s)MAXIMUM DRY DENSITY (PCF)OPTIMUM MOISTURE CONTENT (%)SPECIFICATIONELEVATION (FT)NATURAL MOISTURE (%)USCSATTERBERG LIMITSGRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGSPECIFICATION ‐ PERCENT PASSINGMOISTURE/DENSITYSAMPLE NUMBERDATE SAMPLEDLOCATIONPage 1 of 3Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.