Laserfiche WebLink
Table 8Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Leak Detection Fill1.0" 0.75" 0.5" 0.375" #4 #10 #20 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100 ‐ ‐ 40‐70 5‐50 ‐ ‐ 0‐20 ‐ ‐ 0‐10NP NP NP1LDF‐1‐R 11/06/14 1 54,749.1 35,616.1 9,628.3 3.2 100 95 70 58 36 23 15 12 10 75.6 GP NP NV NP1LDF‐2‐R 04/09/15 1 55,534.6 34,209.6 9,525.6 3.2 100 90 59 46 25 15 10 7 6 5 3.6GP NP NV NPNFLDF‐1‐R 04/26/16 1 Top of Pipe 6.0 100 95.6 69.1 54.4 30.8 18.3 11.9 8.8 7.5 5.8 4.5 GP NP NV NPNFLDF‐2‐R 06/22/16 1 FG 3.4 100 89 64.9 53.7 33.9 22.1 16.1 13.1 11.5 9.1 7.2 GP‐GM NP NV NPSTA HM4+00STA H18+00USCSATTERBERG LIMITSSPECIFICATIONGRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGSPECIFICATION ‐ PERCENT PASSINGSAMPLE NUMBERDATE SAMPLEDLOCATIONELEVATION (FT)NATURAL MOISTURE (%)NP ‐ Non PlasticNV ‐ No ValuePage 1 of 1Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.