Laserfiche WebLink
Table 6Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Select Structural Fill3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #4 #10 #20 #40 #50 #100 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100‐‐‐‐‐‐‐‐‐‐‐‐‐NP NP NP1SSF‐1‐R 08/06/14 1 55,738.9 35,840.8 9,507.4 9.3 100 100 95 79 70 59 53 39 2821 16 15 12 9.5 GP‐GM NP NV NP1SSF‐2‐R 10/08/14 1 ‐ 8.5 100 93 83 72 63 55 52 37 26 19 14 13 10 8 GP‐GM NP NV NP2SSF‐1‐R 02/19/14 1 ‐ 8.1 100 95 92 78 64 48 40 26 17 11 8 7 4 2.3 GW NP NV NP2SSF‐2‐R 03/18/14 2 ‐ 8.8 100 96 83 68 53 31 23 14965432.6GW NP NV NP2SSF‐3‐R 01/08/15 2 58,050.6 34,610.7 9,777.6 8.8 100 99 99 98 98 97 97 71 45 3123211613 SM NP NV NP2SSF‐4‐R 03/05/15 2 58,753.7 34,708.0 9,920.2 ‐ 100 67 50 36 24921110.40.40.30.2GP NP NV NP2SSF‐5‐R 09/11/14 2 ‐ ‐ 100 79 70 54 44 31 26 18 1397654 GP NP NV NPNFSSF‐1‐C 04/05/16 2 3rd Lift 6.9 100 95.3 87.6 75.6 63.2 48.4 41.3 31.6 22.3 15.7 12.2 10.6 8.4 6.8 GP‐GM NP NV NPNFSSF‐2‐C 08/09/16 2 1st Lift 6.6 100 98.7 96.5 83.7 75.6 63.2 56.4 48.6 33.3 20.3 13.7 11.2 8.3 6.4 GW‐GM NP NV NPUSCSATTERBERG LIMITSSPECIFICATIONSAMPLE NUMBERDATE SAMPLEDLOCATIONELEVATION (FT)NATURAL MOISTURE (%)GRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGSPECIFICATION ‐ PERCENT PASSINGUG#6617 1st StepTertiary UnderdrainSTA J1+00STA I9+00UG #6543UG#6617 1st StepNP ‐ Non PlasticNV ‐ No ValuePage 1 of 1Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.