My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (37)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (37)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:54:06 AM
Creation date
12/22/2016 8:15:44 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - 3 Tables
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table 5Cripple Creek & Victor Gold Mining CompanySquaw Gulch Valley Leach FacilityPhase 1 CompletionCQA Earthworks Testing Summary ‐ Underdrain Fill12.0" 8.0" 5.0" 4.0" 3.0" 2.0" 1.5" 1.0" 0.75" 0.5" 0.375" #40 #200PLASTIC LIMITLIQUID LIMITPLASTIC INDEXPHASE NORTHING EASTING100‐‐‐‐‐‐‐‐‐‐‐0‐6NP NV NP1UF‐1‐R 02/17/14 1 9,825.0 100 100 61 25 5 0.2 0.2000000GP NP NV NP1UF‐2‐R 04/02/13 1 55,773.9 35,749.1 9,470.0 100 100 100 79 4596544.2000SP NP NV NP1UF‐3‐R 04/03/13 1 ‐ 100 100 100 46210000000GP NP NV NP2UF‐1‐R 03/18/14 2 ‐ 100 100 70 51 5 0.10000000GP NP NV NP2UF‐2‐R 01/07/15 2 58,349.9 34,656.4 9,820.7 100 10088100000000GP NP NV NP2UF‐3‐R 03/05/15 2 58,798.1 34,711.9 9,930.6 100 100 74 26 15 2 1 0.3 0.3 0.3 0.3 0 0 GP NP NV NP2UF‐4‐R 05/04/15 2 58,226.0 35,746.0 9,940.0 100 48 ‐ 20.1 12.6 6.7 3.6 1.7 1.1 0.7 0.6 0.4 0.3 GP NP NV NPTertiary UnderdrainBench I STA I19+00 HR 47+00USCSATTERBERG LIMITSSPECIFICATION ‐ PERCENT PASSING SPECIFICATIONGRAIN SIZE DISTRIBUTION ‐ PERCENT PASSINGSAMPLE NUMBERDATE SAMPLEDLOCATIONELEVATION (FT)2nd Udrain Stat J2+00NP ‐ Non PlasticNV ‐ No ValuePage 1 of 1Gray text reflects tests performed outside of thePhase 1 Completion certification boundary.
The URL can be used to link to this page
Your browser does not support the video tag.