Laserfiche WebLink
SOIL LINER FILL BORROW <br />100 0 100 200 FEET <br />I <br />o <br />�I <br />/ <br />SQUAW GULCHTF- <br />©F�` <br />OVERALL PROJECT SITE MAP <br />1000 0 1000 2000 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (LAND SURVEY) <br />!-- MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />— ISOPACH CUT CONTOURS AND EL, FEET <br />�—� ISOPACH ZERO CUT/FILL AND EL, FEET <br />EXISTING ROADS <br />HIGHWAY 67 NOTE: <br />EXISTING BUILDING 1. BASED ON THE TEST PITS PERFORMED IN THE SOIL LINER FILL <br />BORROW AREA, AMEC HAS ESTIMATED APPROXIMATELY 150,000 <br />0 TP -50 AMEC TEST PIT JULY 2010 CUBIC YARDS OF AVAILABLE BORROW AFTER PROCESSING. <br />OSWTP-27 SMITH WILLIAMS TEST PIT JUNE 2007 2. DRAWING IS A NEW ADDITION TO THE ISSUED FOR <br />CONSTRUCTION SET. <br />GTP -15 GOLDER ASSOCIATES TEST PIT 2004 <br />APPROXIMATE SOIL LINER FILL BORROW AREA <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO — PHASE 1 — REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO — PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO — PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TORO EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH 67 TOP O 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOP O EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028—COMOSITE—TOPO MILE LIMITS.DWG CLIENT <br />(RECV MAY 28, 2010 FROM CC&V) <br />Nllk <br />o <br />A AA V <br />o <br />O <br />Pv <br />vvv vv <br />1 0 <br />_ <br />i <br />��o <br />C <br />i ATE HIGHWAY <br />/ <br />0 <br />SOIL LINER FILL BORROW <br />100 0 100 200 FEET <br />I <br />o <br />�I <br />/ <br />SQUAW GULCHTF- <br />©F�` <br />OVERALL PROJECT SITE MAP <br />1000 0 1000 2000 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (LAND SURVEY) <br />!-- MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />— ISOPACH CUT CONTOURS AND EL, FEET <br />�—� ISOPACH ZERO CUT/FILL AND EL, FEET <br />EXISTING ROADS <br />HIGHWAY 67 NOTE: <br />EXISTING BUILDING 1. BASED ON THE TEST PITS PERFORMED IN THE SOIL LINER FILL <br />BORROW AREA, AMEC HAS ESTIMATED APPROXIMATELY 150,000 <br />0 TP -50 AMEC TEST PIT JULY 2010 CUBIC YARDS OF AVAILABLE BORROW AFTER PROCESSING. <br />OSWTP-27 SMITH WILLIAMS TEST PIT JUNE 2007 2. DRAWING IS A NEW ADDITION TO THE ISSUED FOR <br />CONSTRUCTION SET. <br />GTP -15 GOLDER ASSOCIATES TEST PIT 2004 <br />APPROXIMATE SOIL LINER FILL BORROW AREA <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO — PHASE 1 — REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO — PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO — PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TORO EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH 67 TOP O 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOP O EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028—COMOSITE—TOPO MILE LIMITS.DWG CLIENT <br />(RECV MAY 28, 2010 FROM CC&V) <br />