My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-21_REPORT - M1980244 (34)
DRMS
>
Day Forward
>
Report
>
Minerals
>
M1980244
>
2016-10-21_REPORT - M1980244 (34)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2017 10:53:36 AM
Creation date
12/22/2016 8:15:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Report
Doc Date
10/21/2016
Doc Name
SGVLF Phase I Cert Report - 1 IFC Drawings
From
CC&V
To
DRMS
Type & Sequence
TR87
Email Name
TC1
AME
ERR
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SOIL LINER FILL BORROW <br />100 0 100 200 FEET <br />OVERALL PROJECT SITE MAP <br />1000 0 1000 2000 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (LAND SURVEY) <br />MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />APPROXIMATELY BOTTOM OF CLAY BORROW REGRADE <br />EXISTING ROADS <br />HIGHWAY 67 <br />EXISTING BUILDING NOTE: <br />0 TP -50 AMEC TEST PIT JULY 2010 1. BASED ON THE TEST PITS PERFORMED IN THE SOIL LINER FILL <br />BORROW AREA, AMEC HAS ESTIMATED APPROXIMATELY 150,000 <br />OSWTP-27 SMITH WILLIAMS TEST PIT JUNE 2007 CUBIC YARDS OF AVAILABLE BORROW AFTER PROCESSING. <br />[j] GTP -15 GOLDER ASSOCIATES TEST PIT 2004 2. REMOVED EXISTING UTILITIES FROM DRAWING. <br />APPROXIMATE SOIL LINER FILL BORROW AREA 3. UPDATED EXISTING GROUND TO INCLUDE MILL PLATFORM. <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO - PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TORO EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH67 TORO 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOP O EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028-COMOSITE-TOPO MILE LIMITS. DWG CLIENT <br />(RECV MAY 28, 2010 FROM CC&V) <br />I' ,�IV IIrW� <br />IIII IIII IIIA <br />IIII �1 I <br />', <br />I <br />� <br />� <br />i <br />- <br />1 IIIIII <br />IIS <br />o <br />IIII <br />I <br />� <br />1 <br />IIIIII;` <br />- <br />III IIII <br />�_ <br />_�-_!J�■�■ <br />11111 �I <br />t 1 <br />�� ® <br />®� - <br />IIIIIIIII <br />It�°I (IIIIIIIII <br />_. <br />_ <br />IIII <br />IIIIIIIII <br />•III <br />�� <br />� <br />� <br />� <br />_ <br />10-11 <br />.I <br />- <br />o ' <br />IIII <br />/ <br />I'llllllll <br />VIIIr <br />J IIIIII <br />0 <br />r <br />_ <br />IIIIII <br />IIS <br />■ <br />I <br />/�I�iA-� <br />o• <br />SOIL LINER FILL BORROW <br />100 0 100 200 FEET <br />OVERALL PROJECT SITE MAP <br />1000 0 1000 2000 FEET <br />LEGEND: <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (AERIAL SURVEY) <br />EXISTING GROUND SURFACE CONTOUR EL, FEET (LAND SURVEY) <br />MILL PLATFORM GROUND SURFACE CONTOUR EL, FEET <br />APPROXIMATELY BOTTOM OF CLAY BORROW REGRADE <br />EXISTING ROADS <br />HIGHWAY 67 <br />EXISTING BUILDING NOTE: <br />0 TP -50 AMEC TEST PIT JULY 2010 1. BASED ON THE TEST PITS PERFORMED IN THE SOIL LINER FILL <br />BORROW AREA, AMEC HAS ESTIMATED APPROXIMATELY 150,000 <br />OSWTP-27 SMITH WILLIAMS TEST PIT JUNE 2007 CUBIC YARDS OF AVAILABLE BORROW AFTER PROCESSING. <br />[j] GTP -15 GOLDER ASSOCIATES TEST PIT 2004 2. REMOVED EXISTING UTILITIES FROM DRAWING. <br />APPROXIMATE SOIL LINER FILL BORROW AREA 3. UPDATED EXISTING GROUND TO INCLUDE MILL PLATFORM. <br />REFERENCE: <br />EXISTING GROUND TOPOGRAPHY WAS CREATED BY COMBINING THE FOLLOWING FILES <br />RECV FROM FORESIGHT WEST SURVEYING, INC.: <br />SQUAW GULCH BASE TORO - PHASE 1 - REVISED.DWG <br />(RECV MARCH 14, 2010) <br />SQUAW GULCH BASE TORO - PHASE 2.DWG <br />(RECV APRIL 24, 2010) <br />SQUAW GULCH BASE TOPO - PHASE 3.DWG <br />(RECV MAY 4, 2010) <br />CCV TORO EXPANSION 12-29-10 NORTH AREA.DWG <br />(RECV JANUARY 13, 2011) <br />CCV TORO EXPANSION 01-28-11 SOUTH AREA.DWG <br />(RECV JANUARY 28, 2011) <br />SH67 TORO 7-07-11.DWG <br />(RECV JULY 11, 2011) <br />VLF2 TOP O EXPANSION 8-05-11.DWG <br />(RECV AUGUST 9, 2011) <br />09028-COMOSITE-TOPO MILE LIMITS. DWG CLIENT <br />(RECV MAY 28, 2010 FROM CC&V) <br />
The URL can be used to link to this page
Your browser does not support the video tag.