Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 17  <br /> Amec  was  unable  to  provide  a  fill  temperature  log  of  earthwork materials  placed  <br />between December 2015 and February 29, 2016.  However, Amec provided CC&V a  <br />letter, included in Appendix N, stating that no frozen material was placed during this  <br />period.   <br /> A portion of the Phase 1 Completion area was lined and had DCF in place at the time  <br />that NewFields became the EOR. Amec was asked to provide verification that all DCF  <br />that was placed within the Phase 1 Completion area was done so in accordance with the  <br />project  technical  specifications.  The  acceptance  that  Amec  provided  is  presented  in  <br />Appendix O.1; however, Amec was unable to provide documentation for the approval of  <br />DCF  placed  on  panels  P‐1578  through  P‐1615.  NewFields  contracted  Leak  Location  <br />Services, Inc. to evaluate the condition of the underlying geomembrane within this area.  <br />Leak  Location  Services  concluded  that  the  geomembrane  was  intact,  with  no  <br />measurable damage. The results of the survey are provided in Appendix O.2.  <br /> ECA had an insufficient supply of 80 mil LLDPE geomembrane to complete the Squaw  <br />Gulch VLF Phase 1. The EOR confirmed that the use of 100 mil LLDPE (single sided  <br />textured and smooth) geomembrane would be an acceptable substitute to complete the  <br />last 16,000 square feet of Phase 1. The 100 mil LLDPE geomembrane meets all required  <br />properties presented in the technical specifications and was previously approved for use  <br />within the Squaw Gulch VLF PSSA. The QC documentation for the 100 mil geomembrane  <br />used within the Squaw Gulch VLF Phase 1 Completion area is presented in Appendix I.  <br />The 100 mil LLDPE geomembrane was placed at the south perimeter berm along the  <br />high grade mill slope, in an area that ore is not expected to be stacked. Due to the size  <br />and location of the area, the EOR believes that the installation of the 100 mil LLDPE  <br />geomembrane accommodates the original intent of the design.  <br />5. ENGINEER’S OPINION  <br />Based on the construction activities observed, testing performed, and inspections completed,  <br />NewFields certifies that the project was constructed in general accordance with the approved  <br />design and technical specifications.  <br />