Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 13  <br />3.4. Geomembrane Construction Quality Assurance  <br />CQA performed on installed LLDPE geomembrane consisted of visual observations of panel  <br />deployment, double‐wedge fusion seaming, extrusion seaming, extrusion welded repairs, non‐ <br />destructive testing, and destructive testing. Fusion welded seams were non‐destructively tested  <br />for continuity using air testing methods. Extrusion welds were non‐destructively tested using  <br />vacuum testing methods. Fusion and extrusion welding methods were also tested destructively.  <br />All field sampling and testing was performed by ECA and observed by the CQA Monitor.  Visual  <br />observations of field seams and panels were routinely made to inspect the seam for squeeze‐ <br />out, melt, over‐grind, and overlap.  Defects and/or failed seams were marked and repaired in  <br />accordance with the specified repair procedures.    <br />Welding machines were continually inspected for proper operation, settings and condition by  <br />performing trial welds prior to actual geomembrane installation.  Logs of the trial welds, panels,  <br />seams,  continuity  testing,  repairs,  and  destructive  testing  were  maintained  by  both  the  <br />contractor and the CQA Monitor on a daily basis. The CQA Monitor’s geomembrane installation  <br />logs are presented in Appendix J.  <br />All geomembrane installation for the Squaw Gulch VLF project was performed in accordance  <br />with design drawings and project specifications. Record Drawing No. 6 shows panel locations,  <br />seams, and destructive test locations.   <br />3.4.1. Third Party Conformance Testing  <br />Third party conformance test samples were obtained at a rate of one test for every  <br />150,000 square feet, and at least one test for each resin lot. Samples were tested by TRI  <br />in Austin, TX. All conformance test results were reviewed by a NewFields representative  <br />and met the technical specifications. Third party conformance test results are presented  <br />in Appendix K.   <br />3.4.2. Geomembrane Panel Deployment  <br />The SLF surface was inspected by the CQA monitor prior to geomembrane deployment,  <br />ensuring the surface was free of any protruding rock greater that 0.75” or irregularities  <br />(rutting, ridges, indentations, etc.) greater than 0.5”. The SLF surface was approved by  <br />ECA, Ames, CC&V, and the CQA Monitor prior to and during deployment each day. SLF  <br />acceptance forms are presented in Appendix E. During geomembrane panel deployment  <br />the CQA Monitor logged the dimensions of each panel, the roll number used for each  <br />panel,  and measured  the  thickness  of  the  panel  edges.  Roll  numbers  were  checked  <br />against the site inventory to ensure only approved geomembrane was deployed. The  <br />Geomembrane Panel Deployment Summary is presented in Appendix J.1.