Laserfiche WebLink
Cripple Creek & Victor Gold Mining Company  <br />Squaw Gulch VLF Phase 1 Completion  <br />Record of Construction Report  <br />475.0106.006  <br />October 14, 2016  <br />  <br />P:\Projects\0106.006 CC&V CQA and EDS\J‐REPORTS\ROC Report\475.0106.006 CCV PHASE 1 ROC REPORT ‐ FINAL161014.DOCX  <br />   Page 11  <br />permeability testing frequencies were one sample for every 4,000 cy. Twenty six SLF  <br />samples were required to be tested for particle size distribution,  atterberg  limits,  <br />laboratory compaction, and permeability testing. Twenty six SLF samples were tested  <br />with passing results. SLF laboratory testing is summarized in Table 9 and individual test  <br />results are presented in Appendix H.5.  <br />The nuclear density/moisture testing frequency for SLF is one test for every 500 cy. Two  <br />hundred and four SLF nuclear density/moisture tests were required.  Two hundred and  <br />sixty six SLF nuclear density/moisture tests were performed with passing results. The  <br />depth check frequency for SLF is two checks for every acre. One hundred and twenty six  <br />SLF depth checks were required. One hundred and thirty eight SLF depth checks were  <br />performed  with  passing  results.  SLF  nuclear  density/moisture  testing  and  SLF  depth  <br />checks are presented in Tables 11 and 12 respectively.  <br />3.2.6. Drain Cover Fill  <br />The Squaw Gulch VLF Phase 1 Completion area was constructed by placing 203,380 cy of  <br />DCF. The particle size distribution and atterberg limits testing frequencies were one  <br />sample for every 20,000 cy. Eleven DCF samples were required to be tested for particle  <br />size and atterberg limits. Eighteen DCF samples were tested with passing results. DCF  <br />laboratory testing is summarized in Table 10 and individual test results are presented in  <br />Appendix H.6.  <br />3.3. Geosynthetics Quality Control Submittals  <br />The  CQA  Monitor  reviewed  and  approved  all  geosynthetic  QC  submittals,  including  <br />geomembrane  installation  personnel  résumés,  geomembrane  roll  QC certificates,  <br />geomembrane resin QC certificates, welding rod QC certificates, and geotextile QC certificates.  <br />The CQA Monitor tracked all geomembrane delivered to site in the site inventory. The site  <br />inventory for all geomembrane used within the Phase 1 Completion area are presented in  <br />Appendix I.1.   <br />3.3.1. Geomembrane Installation Personnel Résumés  <br />ECA submitted the résumés of all installation personnel prior to construction or repair  <br />activities  within  the  Squaw  Gulch  VLF  Phase  1  Completion  area. The  CQA  Monitor  <br />verified  that  the  Installation  Superintendent,  Master  Seamer  and  QC  Inspector  <br />possessed the installation experience required by the project technical specifications.  <br />Geomembrane installation personnel résumés for all crews that performed work on the  <br />Squaw Gulch VLF Phase 1 Completion area are presented in Appendix I.2.