My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-11-25_INSPECTION - C1981041
DRMS
>
Day Forward
>
Inspection
>
Coal
>
C1981041
>
2016-11-25_INSPECTION - C1981041
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/15/2016 9:15:16 AM
Creation date
12/15/2016 7:00:47 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
Inspection
Doc Date
11/25/2016
Doc Name
OSM Inspection Report
From
OSM
To
DRMS
Inspection Date
10/6/2016
Email Name
DIH
BFB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Federal and private coal is mined at this site. DRMS administers the bond release process in part <br />through the State- Federal Cooperative Agreement found at 30 CFR, Part 906.30. DRMS also <br />follows the “Guidelines Regarding Selected Coal Mine Bond Release Issues,”- dated April 18, <br />1995-as well as, sections contained in Rule 4.15, Rule 3 to evaluate reclamation success on bond <br />release sites. The current bond is valued at $805,952.60. <br />The inspection began at 11:30 am. A short meeting occurred – led by Mr. Ebert and Mr. <br />Hernandez- CO DRMS- at the mine site. The purpose of the meeting was to brief everyone on <br />what we would be observing that day. <br />We began by evaluating the Southern portion of the mine site, then, slowly progressed to the <br />northern portion of the mine site. Specifically, Roadside North permanent drainage features, <br />Ponds 6,7,8,9,10,11 and 13, Cameo refuse disposal area #1, Cameo borrow areas #1 and #2 <br />and substation G. <br /> <br />Per OSMRE Phase II and III release rules and the DRMS bond release guidance document, the <br />following items were evaluated: <br /> <br />1.) Topsoil replacement thickness. <br />2.) Vegetation cover and <br />bare areas. <br />3.) Species composition. <br />4.) Re-establishment of essential hydrologic functions on Alluvial Valley <br />Floors (AVF’s). Note: This was not applicable for this mine. <br />5.) Erosional features. <br />6.) The condition of the sediment ponds and any needed maintenance on the ponds receiving <br />runoff from the bond release parcels. <br />7) All temporary ponds/roads/ditches reclaimed with successful reclamation. <br />8) Subsidence areas reclaimed/damage compensation (to landowner) completed. <br /> <br />The location of the areas being released is located on the SL-9 bond release maps submitted with <br />the application. <br /> <br />Administrative: <br /> <br />All administrative standards had been met. <br /> <br />Hydrologic Balance: <br /> <br />All required water monitoring reports were found to be up to date and submitted in a timely <br />fashion. There were no discharging outlets during this inspection. <br />
The URL can be used to link to this page
Your browser does not support the video tag.