Laserfiche WebLink
November 16, 2016 C-1981-012/New Elk Mine RAR <br /> <br /> <br />Number of Partial Inspection this Fiscal Year: 4 <br />Number of Complete Inspections this Fiscal Year: 2 <br /> <br /> Page 5 of 10 <br /> <br /> <br /> <br />Photo 3: Pond 7A. <br /> <br />o Pond 007Awas pumped dry. Currently about <br />3-4 feet of sediment, representing about 300 <br />loads, must be removed. This is scheduled to <br />occur near end of January 2016. This pond <br />was partially cleaned in 2006/7, and one <br />quarter of it was cleaned in 2012. <br />o The pond was pumped to Pond 006A during <br />the last week of August 2016. <br /> <br /> <br /> <br /> <br />Photo 4: Pond 7 discharge pipe. <br /> <br /> <br />o Among the culverts inspected the following were verified on the maps submitted with RN6 <br />and appeared free of sediment and to be functioning properly: <br />C2, C3,C12, C16A, B, C; C20, C32, C37, <br />o Among the ditches inspected the following were verified on maps submitted with RN6 and <br />appeared to be functioning adequately: <br />D2, D3, D4, D5, D6, D7 D9, D16, exceptions were: <br />1. Ditch D12 that exhibited spots along the road were deepening would be prudent. <br />2. D58 and ditches proximal to stream buffer zone were willows should be removed as soon <br />as possible. Maintenance item # 8. <br /> <br /> <br />