Laserfiche WebLink
RULE 2 PERMITS <br />Texaco, Inc. <br />7265 South County Road 9 <br />Craig, Colorado 81625 <br />Pre -blasting surveys and assessments of surface structures have been conducted for eleven power pole <br />foundations and the two residential structures located at 6647 and 7072 MCR 51. Copies of the summary <br />reports are included as Exhibit 14, Items 4 & 5 and are summarized in Section 4.08.2 of this document. <br />Public Notice of Blasting Schedule <br />Colowyo will republish a blasting schedule similar to the one set forth in Volume 1, Section 2.05, Figure <br />1 — Public Notice of Blasting Schedule. <br />Disposal of Excess Spoil <br />Colowyo will construct two separate "valley fills" which will be called the East Taylor Fill and the West <br />Taylor Fill. These fills are necessary due to the early operation of the South Taylor mining area; <br />overburden will need to be placed into the fills so that sufficient working area can be developed prior to <br />the placement of subsequent overburden into the mined -out areas. <br />Detailed geotechnical investigations were completed for both the East Taylor Fill and the West Taylor <br />Fill by Shannon & Wilson, Inc. A report of the investigations can be found in Exhibit 21 Item 1. <br />Construction plans for the fills, addressing the requirements of Rule 4.09, Disposal of Excess Spoil, can <br />also be found in Section 4.09 and Exhibit 21, Item 1. Locations of the East Taylor Fill and West Taylor <br />Fill can be found in Exhibit 21, Item 1 and on Map 23A. <br />2.05.4(l) Reclamation Plan <br />The reclamation objective for the South Taylor area is to restore the mined area to a land use capability <br />which will, be equal to or better than that which currently exists. -The first objectives of all reclamation <br />practices are to stabilize the soils, maintain hydrologic and vegetation resources, and to restore the <br />approximate original contour of the mined area. Ultimately, the areas being mined will be returned to <br />their approximate original use as rangeland with watersheds having their approximate pre -mining <br />character. In general, the long term appearance and usefulness of the mine plan area will be similar to that <br />which would have been encountered prior to any mining. <br />The reclamation plan for the existing mining areas provides information relevant to the reclamation of the <br />South Taylor mining area, which can be found in Volume 1, Section 2.05.4. Specific topics requested by <br />the regulations and not incorporated into Volume 1 are included in the following subsections. <br />2.05.4 (2)(a) Reclamation Timetable <br />The sequence for reclamation following the mining process is shown on Map 29 A. Final reclamation of <br />the South Taylor pit will be delayed, due to the shape, size and depth of the pit; which will result in <br />leaving the majority of the spoil backfilling process until final pit closure. The majority of the spoil will <br />be stacked in the initial boxcut area and associated valley fill areas, allowing adequate space to perform <br />mining operations in a geotechnically safe environment. Colowyo is attempting to reduce the amount of <br />mining related disturbance that is associated with the mining of the South Taylor pit; this also contributes <br />to the situation of stacking spoil material and delaying reclamation, which minimizes the areas impacted <br />by temporary spoil pile placement and concentrates the active mining activities to the existing disturbance <br />boundary for South Taylor. Although the final reclamation of the South Taylor will be delayed due to the <br />South Taylor/Lower Wilson — Rule 2, Page 76 Revision Date: 11 / 18/16 <br />Revision No.: MR -163 <br />