My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-10-19_PERMIT FILE - C1981019A (2)
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981019
>
2016-10-19_PERMIT FILE - C1981019A (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 11:51:45 AM
Creation date
12/13/2016 8:19:58 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019A
IBM Index Class Name
Permit File
Doc Date
10/19/2016
Doc Name
Pages EX13A-TO-1 to EX13A-T18B-2
Section_Exhibit Name
Exhibit 13A Reclamation Cost Estimate
Media Type
D
Archive
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
427
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
130 <br />131 <br />132 <br />133 <br />134 <br />135 <br />136 <br />137 <br />138 <br />139 <br />140 <br />141 <br />142 <br />143 <br />144 <br />145 <br />146 <br />147 <br />148 <br />149 <br />150 <br />160 <br />165 <br />166 <br />167 <br />168 <br />169 <br />170 <br />171 <br />172 <br />173 <br />174 <br />175 <br />177 <br />178 <br />179 <br />Replace 48" of Topsoil on Aspen Study Area <br />TRUCKI <br />2 <br />2 <br />2 <br />1 <br />1 <br />l <br />l <br />1 <br />I <br />l <br />1 <br />I <br />l <br />l <br />1 <br />1 <br />1 <br />1 <br />1 <br />l <br />l <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />9.86 <br />$73,650.76 <br />$55,235.22 <br />$4,603.17 <br />$3,779.41 <br />$2,456.94 <br />$3,968.58 <br />$472.65 <br />$1,417.35 <br />$2,740.41 <br />$566.94 <br />$3,401.64 <br />$661.23 <br />$3,590.82 <br />$4,346.35 <br />$1,606.53 <br />$472.65 <br />$2,929.00 <br />$2,362.06 <br />$2,362.06 <br />$2,362.06 <br />$105,805.00 <br />$258,511.48 <br />$100,115.96 <br />$27,896.45 <br />$135,740.25 <br />$414,718.86 <br />$123,435.60 <br />$63,629.25 <br />$318,974.94 <br />$123,435.60 <br />$155,960.45 <br />$11,058.68 <br />$5,510.97 <br />$2,461.57 <br />$2,020.69 <br />$808.28 <br />Replace 48" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />7.40 <br />Replace 4" of Topsoil on Tall Mountain Shrub <br />Study Area <br />TRUCKI <br />0.62 <br />Replace Topsoil from Stockpile to Gulch A Pond <br />DOZER <br />14.13 <br />Replace Topsoil from Stockpile to Prospect Pond <br />DOZER <br />9.19 <br />Replace Topsoil from Stockpile to Streeter Pond <br />DOZER <br />14.84 <br />Replace Topsoil from Stockpile to Gossard Loop <br />Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to Gossard Pond <br />DOZER <br />5.30 <br />Replace Topsoil from Stockpile to Sewage and <br />Aeration Pond <br />DOZER <br />10.25 <br />Replace Topsoil from Stockpile to Stoker Siding <br />Pond <br />DOZER <br />2.12 <br />Replace Topsoil from Stockpile to Wash Bay Pond <br />DOZER <br />12.72 <br />Replace Topsoil from Stockpile to Wash Bay <br />Sediment Sum <br />DOZER <br />2.47 <br />Replace Topsoil from Stockpile to Work Area <br />Pond <br />DOZER <br />13.43 <br />Replace Topsoil from Stockpile to Section 16 Pond <br />DOZER <br />16.25 <br />Replace Topsoil from Stockpile to East Taylor <br />Pond <br />DOZER <br />6.01 <br />Replace Topsoil from Stockpile to Taylor Pond <br />DOZER <br />1.77 <br />Replace Topsoil from Stockpile to West Pit Pond <br />DOZER <br />10.95 <br />Replace Topsoil from Stockpile to Section 28 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Section 21 Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to West Taylor <br />Pond <br />DOZER <br />8.83 <br />Replace Topsoil from Stockpile to Collection <br />Ditches <br />EXCAVATE <br />679.71 <br />Plug and Seal All Wells and Boreholes <br />BOREHOLE <br />534.00 <br />Reseed East Pit with Grazing Land Seed Mix - <br />Active Pit Area <br />REVEGE <br />545.00 <br />Reseed East Pit with Sagebrush Steppe Seed Mix - <br />Active Pit <br />REVEGE <br />90.40 <br />Reseed East Pit with Grazing Land Seed Mix - <br />Phase II Areas <br />REVEGE <br />420.90 <br />Reseed West Pit with Grazing Land Seed Mix <br />REVEGE <br />2,257.60 <br />Reseed West Pit with Sagebrush Steppe Seed Mix <br />REVEGE <br />400.00 <br />Reseed Section 16 Pit with Grazing Land Seed <br />Mix - Phase II <br />REVEGE <br />394.60 <br />Reseed South Taylor Pit with Grazing Land Seed <br />Mix <br />REVEGE <br />1,736.40 <br />Reseed South Taylor Pit with Sagebrush Steppe <br />Seed Mix <br />REVEGE <br />400.00 <br />Reseed Facilities Area with Grazing Land Seed <br />Mix <br />REVEGE <br />849.00 <br />Reseed Coal Stockpile Area with Grazing Land <br />Seed Mix <br />REVEGE <br />60.20 <br />Reseed Gossard Loadout with Grazing Land Seed <br />Mix <br />REVEGE <br />30.00 <br />Reseed Dragline Walk Road with Grazing Land <br />Seed Mix <br />REVEGE <br />13.40 <br />Reseed Narrowed Access Road with Grazing Land <br />Seed Mix <br />REVEGE <br />11.00 <br />Reseed Gossard Loadout Road with Grazing Land <br />Seed Mix <br />REVEGE <br />4.40 <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.