070
<br />071
<br />072
<br />073
<br />074
<br />075
<br />076
<br />077
<br />078
<br />079
<br />080
<br />081
<br />082
<br />083
<br />084
<br />085
<br />086
<br />090
<br />091
<br />092
<br />093
<br />094
<br />095
<br />096
<br />097
<br />098
<br />099
<br />100
<br />101
<br />102
<br />103
<br />104
<br />105
<br />110
<br />111
<br />112
<br />113
<br />114
<br />115
<br />116
<br />117
<br />118
<br />119
<br />120
<br />121
<br />122
<br />123
<br />124
<br />125
<br />126
<br />127
<br />128
<br />129
<br />Stockpiles for ENANCE
<br />l
<br />l
<br />l
<br />l
<br />l
<br />1
<br />l
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />1
<br />l
<br />1
<br />1
<br />l
<br />1
<br />l
<br />l
<br />1
<br />1
<br />1
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />2
<br />$7,994.36
<br />$8,885.41
<br />$20,203.92
<br />$593.17
<br />$257.30
<br />$3,344.01
<br />$1,954.77
<br />$9,933.60
<br />$462.79
<br />$34,869.04
<br />$11,195.91
<br />$5,163.22
<br />$2,020.39
<br />$14,395.73
<br />$16,869.41
<br />$12,627.45
<br />$5,556.08
<br />$7,161.00
<br />$10,612.00
<br />$2,111.00
<br />$1,795.00
<br />$950.00
<br />$911.00
<br />$3,801.00
<br />$1,690.00
<br />$2,218.00
<br />$4,225.00
<br />$2,007.00
<br />$2,323.00
<br />$2,471.00
<br />$3,481.00
<br />$54,352.00
<br />$8,198.00
<br />$17,521.73
<br />$227,345.36
<br />$76,798.71
<br />$32,100.08
<br />$125,431.69
<br />$402,804.22
<br />$75,668.91
<br />$94,704.57
<br />$33,792.42
<br />$32,427.00
<br />$436,261.87
<br />$869,225.07
<br />$102,730.09
<br />$138,449.92
<br />$2,680.17
<br />$6,797.98
<br />$23,661.90
<br />$46,389.31
<br />$8,134.91
<br />$2,157.38
<br />Regrade Gulch A Pond DOZER
<br />30.76
<br />Regrade Prospect Pond DOZER
<br />34.19
<br />Regrade Streeter Pond DOZER
<br />77.75
<br />Re ade Gossard Loop Pond DOZER
<br />2.28
<br />Regrade Gossard Pond DOZER
<br />0.99
<br />Regrade Sewa a and Aeration Pond DOZER
<br />12.87
<br />Regrade Stoker Siding Pond DOZER
<br />7.52
<br />Regrade Wash Bay Pond DOZER
<br />38.23
<br />Regrade Wash Bay Sediment Sump DOZER
<br />1.78
<br />Regrade Work Area Pond DOZER
<br />134.18
<br />Regrade Section 16 Pond DOZER
<br />43.08
<br />Regrade East Taylor Pond DOZER
<br />19.87
<br />Regrade Taylor Pond DOZER
<br />7.77
<br />Re ade West Pit Pond DOZER
<br />55.40
<br />Regrade Section 28 Pond DOZER
<br />64.92
<br />Regrade Section 21 Pond DOZER
<br />48.59
<br />Regrade West Taylor Pond DOZER
<br />21.38
<br />Remove and Regrade East Collection Ditch EXCAVATE
<br />46.00
<br />Remove and Regrade South Collection Ditch EXCAVATE
<br />68.17
<br />Remove and Regrade Streeter Ditch EXCAVATE
<br />13.56
<br />Remove and Regrade Prospect Collection Ditch EXCAVATE
<br />11.52
<br />Remove and Regrade North Facilities Ditch EXCAVATE
<br />6.10
<br />Remove and Stoker Ditch EXCAVATE
<br />5.85
<br />Remove and Regrade West Side Facilities Ditch EXCAVATE
<br />24.42
<br />Remove and Regrade East Taylor Pond Ditch EXCAVATE
<br />10.85
<br />Remove and Regrade West Pit Coal Road Ditch EXCAVATE
<br />14.24
<br />Remove and Regrade Section 16 Pond Ditch EXCAVATE
<br />27.13
<br />Remove and Regrade Section 16 Taylor Ditch EXCAVATE
<br />12.89
<br />Remove and Regrade Section 16 Perimeter Ditch EXCAVATE
<br />14.92
<br />Remove and Regrade Section 28 Collector Ditch EXCAVATE
<br />15.87
<br />Remove and Regrade Section 29 Collector Ditch EXCAVATE
<br />22.36
<br />Remove and Regrade Ten Sediment Traps EXCAVATE
<br />349.16
<br />Remove and Regrade Six Post -Mining Stock EXCAVATE
<br />Ponds
<br />52.66
<br />Haul Topsoil from Pile IOA to East Pit TRUCKI
<br />2.66
<br />Haul Topsoil from Pile 16A to East Pit TRUCKI
<br />30.44
<br />Haul Topsoil from Pile 16B to East Pit TRUCKI
<br />9.18
<br />Haul Topsoil from Pile 16B Windrow to East Pit TRUCKI
<br />4.30
<br />Haul Topsoil from Pile 4A to West Pit TRUCKI
<br />16.79
<br />Haul Topsoil from Pile 15B to West Pit TRUCKI
<br />53.93
<br />Haul Topsoil from Pile 15K to West Pit TRUCKI
<br />9.05
<br />Haul Topsoil from Pile 16A to West Pit TRUCKI
<br />12.68
<br />Haul Topsoil from Pile 16E to West Pit TRUCKI
<br />4.52
<br />Haul Topsoil from Windrow 5 to West Pit TRUCKI
<br />4.93
<br />Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCKI
<br />58.41
<br />Haul Topsoil from Stockpile 16E to South Taylor TRUCKI
<br />Pit
<br />103.95
<br />Haul Topsoil from New Stockpile South Taylor Pit TRUCKI
<br />12.29
<br />Haul Topsoil from Stockpile 15A to Facilities Area TRUCKI
<br />18.54
<br />Haul Topsoil from Stockpile 15E to Facilities Area TRUCKI
<br />0.41
<br />Haul Topsoil from Stockpile 15F to Facilities Area TRUCKI
<br />1.03
<br />Haul Topsoil from Stockpile 15G to Facilities Area TRUCKI
<br />3.17
<br />Haul Topsoil from Stockpile 15H to Facilities Area TRUCKI
<br />7.06
<br />Haul Topsoil from Stockpile 15I to Facilities Area TRUCKI
<br />1.24
<br />Haul Topsoil from Stockpile Gossard Loadout TRUCKI
<br />0.33
<br />CIRCES Cost Estimating Software