Laserfiche WebLink
070 <br />071 <br />072 <br />073 <br />074 <br />075 <br />076 <br />077 <br />078 <br />079 <br />080 <br />081 <br />082 <br />083 <br />084 <br />085 <br />086 <br />090 <br />091 <br />092 <br />093 <br />094 <br />095 <br />096 <br />097 <br />098 <br />099 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />110 <br />111 <br />112 <br />113 <br />114 <br />115 <br />116 <br />117 <br />118 <br />119 <br />120 <br />121 <br />122 <br />123 <br />124 <br />125 <br />126 <br />127 <br />128 <br />129 <br />Stockpiles for ENANCE <br />l <br />l <br />l <br />l <br />l <br />1 <br />l <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />l <br />1 <br />1 <br />l <br />1 <br />l <br />l <br />1 <br />1 <br />1 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />2 <br />$7,994.36 <br />$8,885.41 <br />$20,203.92 <br />$593.17 <br />$257.30 <br />$3,344.01 <br />$1,954.77 <br />$9,933.60 <br />$462.79 <br />$34,869.04 <br />$11,195.91 <br />$5,163.22 <br />$2,020.39 <br />$14,395.73 <br />$16,869.41 <br />$12,627.45 <br />$5,556.08 <br />$7,161.00 <br />$10,612.00 <br />$2,111.00 <br />$1,795.00 <br />$950.00 <br />$911.00 <br />$3,801.00 <br />$1,690.00 <br />$2,218.00 <br />$4,225.00 <br />$2,007.00 <br />$2,323.00 <br />$2,471.00 <br />$3,481.00 <br />$54,352.00 <br />$8,198.00 <br />$17,521.73 <br />$227,345.36 <br />$76,798.71 <br />$32,100.08 <br />$125,431.69 <br />$402,804.22 <br />$75,668.91 <br />$94,704.57 <br />$33,792.42 <br />$32,427.00 <br />$436,261.87 <br />$869,225.07 <br />$102,730.09 <br />$138,449.92 <br />$2,680.17 <br />$6,797.98 <br />$23,661.90 <br />$46,389.31 <br />$8,134.91 <br />$2,157.38 <br />Regrade Gulch A Pond DOZER <br />30.76 <br />Regrade Prospect Pond DOZER <br />34.19 <br />Regrade Streeter Pond DOZER <br />77.75 <br />Re ade Gossard Loop Pond DOZER <br />2.28 <br />Regrade Gossard Pond DOZER <br />0.99 <br />Regrade Sewa a and Aeration Pond DOZER <br />12.87 <br />Regrade Stoker Siding Pond DOZER <br />7.52 <br />Regrade Wash Bay Pond DOZER <br />38.23 <br />Regrade Wash Bay Sediment Sump DOZER <br />1.78 <br />Regrade Work Area Pond DOZER <br />134.18 <br />Regrade Section 16 Pond DOZER <br />43.08 <br />Regrade East Taylor Pond DOZER <br />19.87 <br />Regrade Taylor Pond DOZER <br />7.77 <br />Re ade West Pit Pond DOZER <br />55.40 <br />Regrade Section 28 Pond DOZER <br />64.92 <br />Regrade Section 21 Pond DOZER <br />48.59 <br />Regrade West Taylor Pond DOZER <br />21.38 <br />Remove and Regrade East Collection Ditch EXCAVATE <br />46.00 <br />Remove and Regrade South Collection Ditch EXCAVATE <br />68.17 <br />Remove and Regrade Streeter Ditch EXCAVATE <br />13.56 <br />Remove and Regrade Prospect Collection Ditch EXCAVATE <br />11.52 <br />Remove and Regrade North Facilities Ditch EXCAVATE <br />6.10 <br />Remove and Stoker Ditch EXCAVATE <br />5.85 <br />Remove and Regrade West Side Facilities Ditch EXCAVATE <br />24.42 <br />Remove and Regrade East Taylor Pond Ditch EXCAVATE <br />10.85 <br />Remove and Regrade West Pit Coal Road Ditch EXCAVATE <br />14.24 <br />Remove and Regrade Section 16 Pond Ditch EXCAVATE <br />27.13 <br />Remove and Regrade Section 16 Taylor Ditch EXCAVATE <br />12.89 <br />Remove and Regrade Section 16 Perimeter Ditch EXCAVATE <br />14.92 <br />Remove and Regrade Section 28 Collector Ditch EXCAVATE <br />15.87 <br />Remove and Regrade Section 29 Collector Ditch EXCAVATE <br />22.36 <br />Remove and Regrade Ten Sediment Traps EXCAVATE <br />349.16 <br />Remove and Regrade Six Post -Mining Stock EXCAVATE <br />Ponds <br />52.66 <br />Haul Topsoil from Pile IOA to East Pit TRUCKI <br />2.66 <br />Haul Topsoil from Pile 16A to East Pit TRUCKI <br />30.44 <br />Haul Topsoil from Pile 16B to East Pit TRUCKI <br />9.18 <br />Haul Topsoil from Pile 16B Windrow to East Pit TRUCKI <br />4.30 <br />Haul Topsoil from Pile 4A to West Pit TRUCKI <br />16.79 <br />Haul Topsoil from Pile 15B to West Pit TRUCKI <br />53.93 <br />Haul Topsoil from Pile 15K to West Pit TRUCKI <br />9.05 <br />Haul Topsoil from Pile 16A to West Pit TRUCKI <br />12.68 <br />Haul Topsoil from Pile 16E to West Pit TRUCKI <br />4.52 <br />Haul Topsoil from Windrow 5 to West Pit TRUCKI <br />4.93 <br />Haul Topsoil from Stockpile 16D to Section 16 Pit TRUCKI <br />58.41 <br />Haul Topsoil from Stockpile 16E to South Taylor TRUCKI <br />Pit <br />103.95 <br />Haul Topsoil from New Stockpile South Taylor Pit TRUCKI <br />12.29 <br />Haul Topsoil from Stockpile 15A to Facilities Area TRUCKI <br />18.54 <br />Haul Topsoil from Stockpile 15E to Facilities Area TRUCKI <br />0.41 <br />Haul Topsoil from Stockpile 15F to Facilities Area TRUCKI <br />1.03 <br />Haul Topsoil from Stockpile 15G to Facilities Area TRUCKI <br />3.17 <br />Haul Topsoil from Stockpile 15H to Facilities Area TRUCKI <br />7.06 <br />Haul Topsoil from Stockpile 15I to Facilities Area TRUCKI <br />1.24 <br />Haul Topsoil from Stockpile Gossard Loadout TRUCKI <br />0.33 <br />CIRCES Cost Estimating Software <br />